Laserfiche WebLink
Demolition and Wrecking <br />$30 plus $3.00 per 1,000 cubic feet or <br />fraction thereof over 2,000 cubic feet plus <br />$5.00 surcharge <br />Residential Door or Window Installation <br />Change Opening/Egress <br />$40 for first windows/door plus $12.50 for <br />each additional window/door (plus $5.00 <br />surcharge) <br />Use Existing Rough opening <br />$30 for first window/door plus $5.00 for each <br />additional window/door (plus $5.00 <br />surcharge) <br />Driveways, Sidewalks, Parking Lots, Patios; New Installation or Overlay (No Surcharge) <br />* A Right-of-way permit is also required for any construction that disrupts City -owned streets, <br />curbing, sidewalks, etc. <br />Residential Concrete/Asphalt/Brick: $30 for first 500 <br />(R-1 or R-2 Overlay or Seal Coating with no square feet plus $2 for each additional 100 <br />expansion, no permit needed.) square feet or fraction thereof (no surcharge) <br />Gravel*: $20 (no surcharge) <br />* See zoning code for gravel limitations. <br />R-4 or R-4 Overlay $25 for first 500 square feet plus $2 for each <br />additional 500.square feet. <br />Commercial Use Valuation Table <br />Electrical Work -- Same as established by the Minnesota State Board of Electricity. <br />Elevators Use valuation table <br />Fences/Kennels <br />Six feet and below <br />$30 per installation (no surcharge) <br />Above six feet <br />$40 per installation(plus $5.00 surcharge) <br />Fire Permits <br />Fire Alarm Systems/Panels <br />$100 <br />Fire Works Display <br />$100 <br />Fireworks Sales <br />$350 (business selling only fireworks) <br />$100 (business selling fireworks & other <br />retail) <br />Temporary Tent <br />$50 <br />Tank Installation (fuel, oil, gas, etc.) <br />$100 per tank (no surcharge) <br />Tank Removal (fuel, oil, gas, etc.) <br />$50 per tank (no surcharge) <br />Operational Permits <br />150 $25(annually) <br />Fireplaces <br />Wood/Corn burning Stove (Building Permit) <br />$30 plus $5.00 surcharge <br />Gas Fireplace <br />See Mechanical <br />Insulation <br />$30 plus $5.00 surcharge <br />Manufactured Homes (See Chapter 1110) <br />Installation Work <br />Use valuation table <br />Mechanical (Gas hook up) <br />$25 plus $5.00 surcharge) <br />2014 Fee Schedule Page 5 of 22 <br />