My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2013/11/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
Agenda Packets - 2013/11/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:15 PM
Creation date
6/26/2018 8:04:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/25/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
11/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VI. PUBLIC WORKS RELATED FEES <br />CALL -OUT RATE SCHEDULE used for all hour) -based fees in this chapter) <br />Normal Business Hours for Call -out Rates <br />7:00 a.m. to 3:90 3:30 p.m., Monday thru <br />Friday <br />Standard Call -out Rate: Specified time <br />$50 per hour specified <br />conducted entirely within normal business <br />hours <br />After -Hours Call -out Rate: Specified time <br />$100 per hour specified <br />conducted outside normal business hours <br />Holiday Call -out Rate: Specified time <br />$150 per hour specified <br />conducted on holidays <br />RIGHT-OF-WAY MANAGEMENT FEES Cha ter 910 <br />Registration Fee Annual <br />$30 <br />Excavation Permit Fees:* <br />Hole Fee <br />$1-35 150 per hole excavated <br />Trench Fees (requires Hole Fee) <br />W 70per 100 lineal feet of trenching <br />beyond hole <br />Trenchless Fees (req. Hole Fee) <br />W 35per 100 lineal feet of utility installed <br />using trenchless methods HDD, etc. <br />Obstruction Permit Fees:* <br />Obstruction Base Fee <br />$99 70 per obstruction <br />Lineal Obstruction Fee <br />$10 per 100 lineal feet obstructed (in-line w/ <br />(requires Obstruction Base Fee) <br />trafficper each week of obstruction <br />Permit Extension Fee <br />$2-5$30 <br />Delay Penalty <br />$15 per da <br />Restoration Cost Security: Determined on a <br />permit -by -permit basis by the PW Director <br />Minimum security amounts: <br />Hole Excavation (per hole) <br />Paved Areas: $588 5 000 <br />Turf Areas: $250 <br />Trench Excavation (per 100 feet) <br />Paved Areas: $2;5GG 5 000 <br />Turf Areas: $500 <br />Trenchless Excavation (per 100 feet) <br />Paved Areas: $500 <br />Turf Areas: $100 <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />C it <br />2014 Fee Schedule Page 19 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.