Laserfiche WebLink
CONSTRUCTION SITE AND LAND DISTURBANCE <br />FEES Ord. 804/Chapter 1303) <br />Land Disturbance Permit Fees:" <br />50 cubic yards or less <br />$25 <br />51 to 100 cubic yards <br />$50 <br />101 to 1000 cubic yards <br />$50 base fee plus $20 for each 100 cubic <br />yards or fraction thereof <br />1001 to 10,000 cubic yards <br />$250 base fee plus $25 for each 1000 cubic <br />yards or fraction thereof <br />10,001 to 100,000 cubic yards <br />$500 base fee plus $100 for each 10,000 <br />cubic yards or fraction thereof <br />100,001 cubic yards or more <br />$1,500 base fee plus $250 for each <br />100,000 cubic yards or fraction thereof. <br />Additional fees may be required for legal and consulting engineering costs incurred by the <br />Cit <br />OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time isrounded up to the nearest full hour) <br />Overweight/Oversize Permit Fees ` c <br />tri 25 per load <br />Emergency Utility Locates <br />No charge if during business hours, <br />otherwise actual time at call -out rate <br />Call -out Charge for Contractor Negligence Actual time at Call -out Rates <br />lack of maintenance, traffic si ns, etc. <br />Water Tower Communications Fees: <br />No charge if during normal business hours, <br />Water Tower Access Fee <br />otherwise actual time at Call -out Rate per <br />visit <br />Plan Review and Inspection Fees <br />Actual <br />ineerin legal, <br />nt costsand <br />$2,000 minconsulting mum <br />Page 22 of 22 <br />on�n rye Schedule <br />