Laserfiche WebLink
2505 Colony C3oad i Sevuer Repair iosc Surnrnary <br />Date <br />Work By <br />Description <br />$ <br />Cost <br />27,399.50 <br />2/16-21/2013 <br />Dave Perkins contracting, Inc. <br />Sewer Repair <br />$ <br />4,276.00 <br />2/19-20/2013 <br />Blake Drilling Company, Inc. <br />Dewatering for sewer repair <br />backfill material & gravel base <br />$ <br />3,450.48 <br />2/21/2013 <br />Barton Sand & Gravel Co. <br />temporary concrete street patch <br />y <br />$ <br />7,700.00 <br />2/21/2013 <br />Neecl<Constructionlnc. <br />traffic control <br />$ <br />1,699.14 <br />2/15-28/2013 <br />Highway Technologies <br />$ <br />44,525.12 <br />subtotal - vendors <br />2/16-22/2013 Mounds View Public Works staff time - reimbursed $ 4,610.16 <br />$ 807.50 <br />2/16-22/2013 Mounds View Public Works equipment costs $ 5,417.66 <br />subtotal - City costs <br />$ 49,942.7B <br />total cost <br />