My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2013/11/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
Agenda Packets - 2013/11/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:15 PM
Creation date
6/26/2018 8:04:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/25/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
11/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SIP #1 <br />d ilrV 0h-:,' Wd00I>HV -3 V11I�VV <br />Ciey l7rOjerf f�io. <br />DEPARTMENT O P IWJ( WORKS 20 -i8 -o02 <br />® ® 2401 HIGHWAY 10 - MOUNDS VIEW, MIDI 55112 <br />(763) 717-4050 - FAX (763) 717-4019 <br />` ® v�rnv ci mounds-vievmn us/publicvaorks <br />ii fell li@ ��11' 1 1��FULTRAWRON PROD R h"j PHL' p . P_"P�t 0— F fl) R, Gill <br />20VI Sil REET AND UTILITY lhWrj1=10Vrz:1UJFMy S�t�fl tJ F, u' — Ak ,r -A C <br />properiy owner In-formatilon <br />r <br />Name -= )"lI 0 f o Yt (' C> <br />Address " '21 All- C\/ <br />i <br />E -Mail <br />V -e _. <br />Work #, <br />�. <br />Homo #<�7G —O 27�( <br />Cell #f <br />Fax # <br />SIS' ASapeal PI.Oc;ess <br />In addition to the street reconstruction and utility improvements included in the project, stornrNaier <br />infiltration basins within City -owned right-of-way (commonly referred to as the boulevard) will be <br />constructed next to the street to capture and infiltrate stormwater runoff from the newly reconstructed <br />streets. <br />The City has officially established the Stormwater Infiltration Program (SIP) Appeal Process by which <br />property owners can appeal the City's decision to construct an infiltration swale in the City owned right-of- <br />way next to their property. The SIP Appeal Process includes a list of specific conditions by which an <br />appeal can be based these are referred to as "Hardship Parameters". <br />The appeal must be submitted to the City in writing, with the submittal procedure outlined as follows <br />1. Obtain a SIP appeal form in the Public Works Department at City Hail, 2401 Co. Highway 10 or <br />on the project webpage via \Afww.ci.mouiids-view-i-nn.us/publicworks. <br />2. Fill out the appropriate contact information on the appeal form. <br />3. Provide a written argument to substantiate the claim of an appeal condition, including supporting <br />documentation or evidence as necessary. <br />4. Postmark or return the appeal form and necessary supporting documentation to the Public Works <br />Department at the address located above no later than 4130 Ion' November 7 22013. <br />5. City engineering staff will review the appeal forms submitted by the deadline and make a <br />recommendation for approval or denial based upon the parameter(s) claimed by the property <br />owner. Staff recommendations will be reviewed with the Streets and Utilities Committee on <br />Nrpvea2�laer' 18, 20-0, at which time the committee will also provide a recommendation for <br />approval or denial of the appeal. <br />G. The City Council will review the engineering staff and comniitiee recommendations during a. <br />regularly scheduled City Council meeting (tentatively planned for tmotrr3s,+,F:}r�' 'l =_) and .vi'' <br />make the final decision to approve or deny a submitted appeal. The decision of the City COunL <br />regarding the appeal shall be final. <br />7, Property ot�mers submitting an appeal have the opportunity to attend the Streets and Utilities <br />committee and City Council meetings to provide verbal input to the appeal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.