Laserfiche WebLink
CONSTRUCTION SITE AND LAND DISTURBANCE FEES Ord. 804/Chapter 1303 <br />Land Disturbance Permit Fees:* <br />50 cubic yards or less <br />$25 <br />51 to 100 cubic yards <br />$50 <br />101 to 1000 cubic yards <br />$50 base fee plus $20 for each 100 cubic <br />yards or fraction thereof <br />1001 to 10,000 cubic yards <br />$250 base fee plus $25 for each 1000 cubic <br />yards or fraction thereof <br />10,001 to 100,000 cubic yards <br />$500 base fee plus $100 for each 10,000 <br />cubic yards or fraction thereof <br />100,001 cubic yards or more <br />$1,500 base fee plus $250 for each <br />100,000 cubic yards or fraction thereof. <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />Cit <br />OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) <br />Overweight/Oversize Permit Fees <br />$50 daily per vehicle (One time t ps) <br />$150 weekly ehiGle <br />p (Regularly scheduled <br />25 perload <br />Emergency Utility Locates <br />No charge if during business hours, <br />otherwise actual time at call -out rate <br />Call -out Charge for Contractor Negligence <br />Actual time at Call -out Rates <br />lack of maintenance, traffic signs, etc. <br />Water Tower Communications Fees: <br />Water Tower Access Fee <br />No charge if during normal business hours, <br />otherwise actual time at Call -out Rate per <br />visit <br />Plan Review and Inspection Fees <br />Actual City, legal, and consulting <br />engineering costs $2,000 minimum <br />2014 Fee Schedule Page 21 of 21 <br />