My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2013/11/04
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2013
>
Agenda Packets - 2013/11/04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:54 PM
Creation date
6/26/2018 8:06:21 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/4/2013
Supplemental fields
City Council Document Type
City Council Packets
Date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION SITE AND LAND DISTURBANCE FEES Ord. 804/Chapter 1303 <br />Land Disturbance Permit Fees:* <br />50 cubic yards or less <br />$25 <br />51 to 100 cubic yards <br />$50 <br />101 to 1000 cubic yards <br />$50 base fee plus $20 for each 100 cubic <br />yards or fraction thereof <br />1001 to 10,000 cubic yards <br />$250 base fee plus $25 for each 1000 cubic <br />yards or fraction thereof <br />10,001 to 100,000 cubic yards <br />$500 base fee plus $100 for each 10,000 <br />cubic yards or fraction thereof <br />100,001 cubic yards or more <br />$1,500 base fee plus $250 for each <br />100,000 cubic yards or fraction thereof. <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />Cit <br />OTHER MISCELLANEOUS PUBLIC WORKS FEES (Actual time is rounded up to the nearest full hour) <br />Overweight/Oversize Permit Fees <br />$50 daily per vehicle (One time t ps) <br />$150 weekly ehiGle <br />p (Regularly scheduled <br />25 perload <br />Emergency Utility Locates <br />No charge if during business hours, <br />otherwise actual time at call -out rate <br />Call -out Charge for Contractor Negligence <br />Actual time at Call -out Rates <br />lack of maintenance, traffic signs, etc. <br />Water Tower Communications Fees: <br />Water Tower Access Fee <br />No charge if during normal business hours, <br />otherwise actual time at Call -out Rate per <br />visit <br />Plan Review and Inspection Fees <br />Actual City, legal, and consulting <br />engineering costs $2,000 minimum <br />2014 Fee Schedule Page 21 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.