My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2012/01/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2012
>
Agenda Packets - 2012/01/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:03 PM
Creation date
6/26/2018 9:21:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/23/2012
Supplemental fields
City Council Document Type
City Council Packets
Date
1/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
information SHEEt <br />Colorado | minnESota <br />recommissioning <br />Save on energy CoStS and InCreaSe Comfort wIth <br />reCommISSIonIng from XCel energy <br />XCEL ENERGY REBATES HELP <br />OFFSET RECOMMISSIONING <br />COSTS <br />Study Rebates: Xcel Energy helps pay <br />for upfront recommissioning study costs <br />– up to 75 percent of the study cost (not <br />to exceed $25,000). <br /> Implementation Rebates: Xcel Energy <br />provides rebates up to 60 percent of the <br />measure cost for implementing the <br />energy-efficiency recommendations in <br />your study. <br />Every building has the potential to oper- <br />ate more efficiently. In fact, conducting a <br />building tune-up – “recommissioning” or <br />“retrocommissioning” – can help save as <br />much as 20 percent on energy bills. Re- <br />commissioning your facility is an economi- <br />cal way to identify electric and natural-gas <br />energy-efficiency improvements. In addi- <br />tion to energy savings, recommissioning <br />offers a number of additional benefits: <br />• Earn valuable credits for environmental <br />programs such as Leadership in Energy <br />and Environmental Design for Exist- <br />ing Buildings (LEED EB) and it could <br />increase your ENERGY STAR® score <br />• Achieve comfortable and convenient <br />energy efficiency for both your organiza- <br />tion and building tenants <br />• Increase equipment life <br />• Provides independent and objective <br />direction for energy saving options <br />Our traditional recommissioning program <br />involves two steps: 1) diagnosis; and <br />2) implementation. Xcel Energy offers <br />rebates to offset out-of-pocket costs for <br />both steps. And we’ll work with you every <br />step of the way until your project <br />is complete. <br />Step One – Conducting a <br />Recommissioning Study <br />Over time, a building can fall out of <br />optimization, or building and staff changes <br />can alter the way your building runs. <br />A recommissioning service provider of <br />your choice will analyze your building <br />and diagnose where you could make <br />improvements to your building’s existing <br />systems, assess your potential energy <br />savings and prepare a study report. Most <br />improvements found in a recommissioning <br />study can be made with little or no cost to <br />you. The report will help you: <br />• Develop an objective business case for <br />efficiency project approval <br />• Detail how best to run your building’s <br />current mechanical systems at peak <br />efficiency <br />• Identify energy savings, costs estimates <br />and corresponding rebate amounts for <br />individual energy conservation opportu- <br />nities available <br />Step Two – Implement <br />Recommendations <br />Once improvement measures are <br />identified, the next step is to implement <br />some or all of the recommendations, <br />whichever makes sense for your company. <br />Most recommissioning measures are low <br />or no cost to you – and focus on equipment <br />tune-ups rather than upgrades. Studies <br />show typical energy savings up to 20 <br />percent, with a simple payback of less <br />than one year.
The URL can be used to link to this page
Your browser does not support the video tag.