Res. 7921 Awarding a Contract to Northwest Asphalt for 2012 Street & Utility Improvement Proj. - Area E <br />Page 2 <br />Public Works also solicited a fee proposal from Braun Intertec Corporation for geotechnical <br />professional services and materials testing for the construction phase of the project. These <br />services are customary for street and utility construction and required by State Aid for <br />designated Municipal State Aid streets (Sunnyside Road). Compensation will be on an hourly <br />plus reimbursable expenses basis for a maximum estimated fee of $29,144, of which $11,895 <br />is associated with Sunnyside Road only. <br /> <br />Recommendation: <br />Staff recommends that the City Council adopt the attached resolution awarding a construction <br />contract for $3,392,175.18 to Northwest Asphalt, Inc. of Shakopee, Minnesota for the 2012 <br />Street and Utility Improvement Project - Area E. In addition, Stantec and Braun Intertec <br />Corporation will be authorized to provide needed professional engineering services associated <br />with the construction phase of the project. If adopted, a neighborhood meeting will be <br />scheduled for April 25, 2012 and major construction will begin shortly thereafter. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br />Nick DeBar - Public Works Director <br /> <br />Attachments: <br /> Resolution 7921 <br /> Stantec Bid Results Letter <br /> <br />Other Project Timeline and Prior City Council Action Summary: <br />The City is in the process of reconstructing 26 miles of City-owned streets and associated <br />underground utilities as part of the Streets and Utilities Improvement Program (Program). The <br />Program includes design standards, a financing plan, a prioritization/implementation (staging) <br />plan, and a communication plan for implementing reconstruction over a 9-year period (2009- <br />2018) with an estimated program cost of $28 million. <br /> <br />The next project area scheduled for construction this summer is Area E. Area E is located <br />between County Road H and H2, and between Silver Lake Road and Long Lake Road. This <br />area is primarily single-family housing, but there are some townhouse developments along <br />County Road H2. Woodcrest Park is also located in this area and there is some undeveloped <br />land north of the park. Area E contains 4.0 miles of streets. <br /> <br />The City Council has taken the following steps, thus far, specific to the Area E project: <br />• Aug. 8, 2011 - Authorized Topographic Survey (Res. 7818); <br />• Sept. 26, 2011 - Authorized Engineering Design & Prepare Bid Documents (Res. 7831); <br />• Nov. 28, 2011 - Authorized Geotechnical/Environmental Evaluations (Res. 7861); <br />• Dec. 12, 2011 - Approved Non-Standard Street Design for Sunnyside Road (Res. 7877); <br />• Jan. 9, 2012 - Denied Stormwater Infiltration Basin (SIP) Appeals (Res. 7885); <br />• Feb. 13, 2012 – Approved Purchase of Supplies for Grouped Mailboxes (Res. 7893); and <br />• Feb 27, 2012 – Approved Bidding Documents and Authorized Ad for Bids (Res. 7905). <br /> <br />In addition to the above, various neighborhood meetings were held to get input from residents <br />regarding non-standard street designs and proposed stormwater basin locations, both as <br />stand-alone meetings and as part of the Street and Utility Committee meetings. There have <br />been many hours of Engineering Division staff time spent on communication, coordination, <br />meetings, reporting, tracking, and other project related activities.