My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:24 PM
Creation date
6/26/2018 5:42:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
4/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution 7771 Awarding a Construction Contract & Authorizing Engineering for the 2011 SUIP-Area D <br />April 11, 2011 <br />Page 3 <br />estimate at bid time. <br /> <br />Area D of the Program includes St. Stephen, Pinewood Court, Jackson Drive, Adams <br />Street, Groberg Street, Lambert Drive, Erickson Road, Clifton Drive, Raymond Avenue, and <br />Belle Lane. These roads are generally located between County Road H2 and I and are on <br />track for a 2011 construction schedule. A map of Area D is attached for reference. <br /> <br />The City Council has taken the following steps, thus far, specifically for the 2011 Street and <br />Utility Improvement Project – Area D: <br /> <br />• Preliminary Survey-Area D: Approved September 28, 2009 (Res. 7504); <br />• Authorized Design Phase/Plans & Specs: Adopted July 12, 2010 (Res. 7643); <br />• Authorized Geotechnical/Environmental Evaluations: Adopted Sept. 13, 2010 (Res. <br />7673); <br />• Pinewood Court Design Configuration: Adopted Sept. 27, 2010 (Res. 7675); <br />• Jackson Drive Design Configuration: Adopted Oct. 25, 2010 (Res. 7693); <br />• Concrete Sidewalk on County Road H2: Adopted Oct. 25, 2010 (Res. 7694); <br />• Denied SIP Appeals/Approved Inf. Basin Locations: Adopted Nov. 18, 2010 (Res. 7702); <br />• Approved Plans/Specifications, set bid date, and authorized Bonestroo to provide <br />engineering services for the Bid Phase: Adopted Feb. 28, 2011 (Res. 7747). <br /> <br />In addition to the above, various neighborhood meetings were held to get input from <br />residents regarding non-standard street designs, both as stand-alone meetings and as part <br />of the Street and Utility Committee meetings. One remaining item to finalize is the <br />pavement marking configuration for the bump-out parking at Lambert Park. This will need <br />to be determined by mid-summer.
The URL can be used to link to this page
Your browser does not support the video tag.