2010 ANNUAL REPORT | DEPARTMENT OF PUBLIC WORKS <br />PAGE 9 <br />2009 Street and Utility Improvement Project – Area A <br />The majority of construction for 4.1 miles of street reconstruction in Area A was completed by <br />December 2009. Clean-up and other miscellaneous work seemed to drag out in 2010, but the final <br />contract completion date was September 30, 2010. A final payment is expected in spring 2011. <br />Construction was performed by North Valley, Inc. of Nowthen, Minnesota. <br />2010 Street and Utility Improvement Project – Area B/C <br />Construction for the combined project of Areas B and C was in high gear during summer 2010 and <br />was substantially completed on November 9, 2010 a few days before winter snow fell. The <br />contractor, Northwest Asphalt of Shakopee, Minnesota had crews working simultaneously in both <br />areas. Before and after photos are included on the previous page showing the dramatic change in <br />neighborhoods. A sidewalk on the east side of Edgewood Drive was reconstructed and lengthened <br />between County Road H and H2. The sidewalk provides a safe walkway for Edgewood Middle <br />School students. Staff worked closely with school personnel to ensure that minimal interruption of <br />school activities. Current construction costs are tracking approximately $220,000 below the contract <br />amount of $2,691,300. <br />2011 Street and Utilities Improvement Project – Area D <br />The City Council authorized Bonestroo to perform engineering services for the design phase of the <br />Area D project. Planning, design, and preparation of plans/specifications were nearly completed at <br />the end of 2010 for the 2.3-mile project. Non-standard street issues that were resolved included <br />Pinewood Court, Jackson Drive, and a proposed sidewalk on the north side of County Road H2 <br />between County Road 10 and Jackson Drive. The project was bid in March 2011 and the low bid <br />amount of $1,969,375 was submitted by Northwest Asphalt – the same contractor for Area B/C. <br />Construction is expected to be complete by fall 2011. <br />2010 Municipal Well No. 1 & 2 Rehabilitation <br />The City’s wells are rehabilitated every seven years. Public Works staff performed all engineering in- <br />house for this project and solicited quotes from qualified contractors. Five quotes ranging from <br />$79,015 to $99,350 were received, with the low quote by Keys Well Drilling Company of St. Paul, <br />Minnesota. Contingency unit prices were also solicited in the event that sand needed to be removed <br />from the bottom of the wells – which was the case for Well No. 1. Approximately 100 cubic yards of <br />sand was removed. Also during construction was a decision to convert Well No. 2 from a 35+ year <br />old, unreliable natural gas engine to a variable speed electric motor. To provide a clean delineation <br />of responsibility between tradesman, the furnishing and installation of the 200 HP motor was added <br />to the project. A $5,000 rebate from Xcel Energy helped offset the $14,530 motor costs. Work was <br />completed in late summer 2010. Final construction cost was $111,787. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Rehabilitation of Municipal Well No. 1 Pedestrian Crossing of CR H2 at Edgewood Drive <br />