Laserfiche WebLink
Item No: 7N <br />Meeting Date: May 23, 2011 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7797, Approving the Bidding Documents and <br />Authorizing Advertisement for Bids for the 2011 Partial Reroofing <br />of City Hall and Full Reroofing of Well House Nos. 5 and 6 Project <br />Background: <br />Public Works has been investigating reoccurring roof issues over the past year, including <br />having a comprehensive roof management program completed for all City-owned buildings. <br />This program recommends a partial reroofing of City Hall and a full reroofing of Well House <br />Nos. 5 and 6 for 2011 construction. In December 2010, the City Council authorized INSPEC, <br />Inc. to design and prepare bidding documents for reroofing of these facilities (Res. 7713). <br /> <br />Discussion: <br />INSPEC has designed and prepared preliminary plans and specifications for the 2011 <br />reroofing project. A small portion of the Community Center roof (over the kitchen) was to be <br />included in the project. However, since the rest (and majority) of the Community Center is <br />scheduled for a reroofing in 2012, that portion is now planned to be done next year with the <br />rest of the Community Center. The following is a narrative of the project scope: <br />Existing System: <br />The existing roof system on City Hall areas A (1960 original building) and B (1975 addition) <br />were installed in 1998. Area A consists of a double tee concrete deck; Area B is a steel deck <br />system; and both areas have two layers of 2" insulation and a ballasted 45-mil EPDM <br />membrane. Wells #5 and #6 have 3" to 4" of polystyrene insulation and a ballasted 45-mil <br />EPDM membrane. The existing insulation R-value is approximately 23. <br />New Roof System: <br />The new roof system was evaluated to determine the best roof system/long term value for the <br />facility. The decision was made to design/install a built-up roof system. The existing roof <br />drains are the original drains at City Hall. They will be replaced with new drains at existing <br />locations. The height above the deck will accommodate the new tapered insulation sumps to <br />improve drainage. New overflow scuppers will be installed at existing locations. At Well <br />House Nos. 5 & 6, new primary scuppers will be installed with new tapered insulation sumps <br />to improve drainage. <br />Special Items: <br />Special items of concern include raising HVAC units, existing gas and electrical lines on roof <br />deck, and removing any obsolete items and replacing with new deck at existing openings. <br />Construction Estimate (INSPEC): <br />INSPEC’s estimated construction costs for the partial reroofing City Hall is $260,000 and <br />$23,000 for each well house for a total estimate of $306,000. <br /> <br /> <br />Funding: