My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/06/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/06/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:30 PM
Creation date
6/27/2018 1:19:32 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/13/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
6/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council May 9, 2011 <br />Regular Meeting Page 7 <br /> <br />Public Works Director DeBar explained the roads were in poor disrepair and the Pubic Works 1 <br />Department has received calls about the poor condition of the streets. The original pavement 2 <br />could have had issues. He indicated the Pubic Works Department spent three days patching the 3 <br />area earlier this spring. However, the patching in this area would not suffice and a reconstruction 4 <br />of these roadways was needed. A mill and overlay was not an option given the condition of the 5 <br />roadway and a complete reclamation may be needed. The City would know more after the 6 <br />engineering work was completed. 7 <br /> 8 <br />Public Works Director DeBar recommended the Council authorize American Engineering 9 <br />Testing, Inc. (AET) to perform pavement and soil evaluations and prepare a preliminary 10 <br />geotechnical engineering report for Mustang Drive, Mustang Circle, Program Avenue and 11 <br />Bronson Drive. The estimated fees for AET would be an hourly rate hourly estimated to be just 12 <br />over $12,000 and funds were budgeted and available in the Street Improvement Fund. Staff 13 <br />recommends a 10% contingency be added to this expense. 14 <br /> 15 <br />Council Member Mueller thanked Staff for sending a letter to the local businesses regarding the 16 <br />possible work to be completed along Program Avenue, Bronson Drive, Mustang Drive and 17 <br />Mustang Circle. She questioned if the City received any comments from the business owners. 18 <br />Public Works Director DeBar indicated the Staff did receive thanks as the road was now 19 <br />passable. 20 <br /> 21 <br />Council Member Mueller asked if a full reclamation was needed, would the reclaimed, ground up 22 <br />material be used in the new surface. Public Works Director DeBar indicated the engineering 23 <br />report would provide the City with this information. He noted the new roadways would be 24 <br />created to withstand 10 tons given its proximity to the Industrial Park. 25 <br /> 26 <br /> Council Member Mueller inquired if the engineering reports would assist with the needed Rice 27 <br />Creek Watershed District documentation. Public Works Director DeBar noted if this remains a 28 <br />maintenance project and the curb stays in place, no new documentation would be needed. 29 <br />However, there may be an issue with the water runoff at the intersection of Mustang 30 <br />Circle/Mustang Drive which may require additional water retention or runoff control. 31 <br /> 32 <br />Mayor Flaherty indicated the testing of Mustang Drive and Mustang Circle should proceed as 33 <br />both roadways were in great need of repair. He questioned if Bronson Drive needed to be 34 <br />repaired at this time, as it was only 15 years old. He asked if there was any warranty. Public 35 <br />Works Director DeBar stated the City had a one year warranty on Bronson Drive and no action 36 <br />could be taken with the original contractor at this time. 37 <br /> 38 <br />MOTION/SECOND: Mueller/Gunn. To Waive the Reading and Adopt Resolution 7782, 39 <br />Authorizing American Engineering Testing, Inc. to Perform Pavement and Soil Evaluations and 40 <br />Prepare a Preliminary Geotechnical Engineering Report for Mustang Drive, Mustang Circle, 41 <br />Program Avenue and Bronson Drive. 42 <br /> 43 <br /> Ayes – 5 Nays – 0 Motion carried. 44 <br /> 45
The URL can be used to link to this page
Your browser does not support the video tag.