My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2011 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
06-27-2011 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:41 PM
Creation date
6/27/2018 1:21:29 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/27/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
6/27/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7C <br />Meeting Date: June 27, 2011 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7801, Awarding a Construction Contract to Rosenquist <br />Construction Inc. for the 2011 Reroofing of City Hall and Well <br />House No. 5 & 6 Project <br />Background: <br />In response to leaking roofs the past several years, a comprehensive roof management <br />program was performed for all City-owned buildings. This program recommended a partial <br />reroofing of City Hall and a full reroofing of Well House Nos. 5 and 6 for the 2011 construction <br />season. In December 2010, the City Council authorized INSPEC, Inc. to design and prepare <br />bidding documents for reroofing of these facilities. The City Council approved the bidding <br />documents and authorized advertisement for bids for the project on May 23, 2011. An ad for <br />bid was placed in the Sun Focus on May 26 and June 2, and in the May 27 and June 3 <br />editions of Finance and Commerce. <br /> <br />Discussion: <br />A public bid opening was held on June 22, 2011 for the 2011 reroofing project. The City <br />received ten lump sum bids from contractors ranging from $183,800 to $313,000 (see <br />attached bid tabulation). The difference between the two lowest bids was $4 or 0.002%, and <br />the third lowest bid was $188,000. Overall, the bids were very favorable. <br />The low bid was submitted by Rosenquist Construction, Inc. of Minneapolis. The City’s <br />consultant, INSPEC, has satisfactory experience with Rosenquist and recommends awarding <br />the construction contract to them. INSPEC has provided an hourly fee estimate of $6,700 for <br />construction observation and inspection services during construction. <br />The proposed 2011 budget includes monies to address the roof replacements being <br />considered. The following is a breakdown of the funding locations: <br />• $175,000 for City Hall under 280-4180-7050, Special Projects; <br />• $65,000 for Well No. 5 & 6 under 700-4823-7050, Water Infra & Equip. Maintenance. <br />Total combined proposed funding amount: $240,000 <br />Rosenquist’s cost split between the City Hall and Well Houses is $128,400 and $55,400 <br />respectively – both well below the budget amounts. <br />Contingency unit prices were also solicited in the bidding process for additional insulation <br />replacement. This was requested since actual condition of some the existing rigid insulation <br />will not be known until demolition of the roof. A unit price of $1.50 per board foot was given by <br />Rosenquist for this contingency item. Given the need to act quickly during construction when <br />the roof is vulnerable, a contingency of 10% or $18,400 is recommended to be added to the <br />construction budget for a total construction budget amount not to exceed $202,200 – well <br />below that of the $240,000 budget amount. Any use of this amount will need City staff <br />authorization. <br />The proposed schedule for construction may begin as early as July 11, 2011 but needs to <br />have final completion by September 15, 2011. However, once started, the Contractor must <br />progress the work until complete for each building.
The URL can be used to link to this page
Your browser does not support the video tag.