My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2011 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
08-08-2011 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:27 PM
Creation date
6/27/2018 1:30:18 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/8/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
8/8/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7E <br />Meeting Date: August 8, 2011 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7818, Authorizing Bonestroo to Perform Topographic <br />Surveying for the Design Phase of the 2010 Street and Utility <br />Improvement Project – Area E <br /> <br />Background: <br />A Streets and Utilities Improvement Program (Program) was created in response to petitioned <br />opposition to the 2007-2008 Street and Utility Improvement Project. Details of the Program were <br />largely developed by a Task Force group during 2007, with much input by residents, City Staff, <br />and consultants, and ultimately adopted by the City Council on October 22, 2007 (Res. 7176). <br />The adopted Program includes design standards, a financing plan, a prioritization/implementation <br />(staging) plan, and a communication plan for implementing reconstruction of approximately 26 <br />miles of City-owned streets and associated utilities over a 9-year period (2009-2018), with an <br />estimated program cost of $28 million. The Program was accelerated with a combined Area B/C <br />project in 2010 and a potential future combined project for Area G/H in 2014. <br /> <br />Other aspects relating to the Program were subsequently adopted, including the following: <br />• Streets and Utilities Committee (Res. 7223) <br />• Stormwater Infiltration Program (SIP) (Res. 7319) <br />• Non-Conforming Driveways (Res. 7338) <br />• Private Improvement Program (PIP) (Res. 7415) <br /> <br />The first three of the nine project areas (A-C) have been constructed and the fourth area (D) is <br />currently under construction. These areas comprise 11.4 miles of the 25.9 total miles of streets <br />included in the Program. The proposed Program map is attached for reference. <br /> <br />Discussion: <br />The next project area scheduled for construction is Area E. Area E is located between County <br />Road H and H2, and between Silver Lake Road and Long Lake Road. This area is primarily <br />single-family housing, but there are some townhouse developments along County Road H2. <br />Woodcrest Park is also located in this area and there is some undeveloped land north of the park. <br />Area E contains 4.0 miles of streets. An aerial map of Area E is also attached for reference. <br /> <br />Public Works staff has been discussing with Bonestroo the scope of work, schedule, and fee for <br />Area E. Bonestroo has performed all the engineering for the design, bid, and construction phases <br />of the Program to date. Given the time needed to design the project, prepare plans and <br />specifications, and to bid the project for construction next year, staff is recommending that we <br />begin this process now. A proposed schedule for the project is attached <br /> <br />The first activity that needs to occur for project development is a topographic survey. This work <br />entails land surveyors collecting in-field data and preparing a base drawing for use in design and <br />engineering. This base map will be the backdrop for which the plans are drafted. Although Public <br />Works staff is still evaluating and negotiating Bonestroo’s overall fee proposal for Area E, staff <br />recommends moving ahead with the topographic survey portion of the proposal to stay on course <br />with the critical path of the project schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.