My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/10/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/10/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:29 PM
Creation date
6/27/2018 1:42:05 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/10/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
10/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7F <br />Meeting Date: October 10, 2011 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7837, Authorizing INSPEC, Inc. to Perform Engineering <br />Design and Prepare Bidding Documents for the 2012 Reroofing of <br />Community Center and Water Treatment Plant No. 1 Project <br />Background: <br />In response to aging and leaky roof issues the past several years, a comprehensive roof <br />management program (Program) was prepared last year for all sixteen City-owned buildings. The <br />Program included detailed inspection, evaluation, costs, and schedules for repairs and <br />replacement for each individual roof section. The recommended immediate repairs were complete <br />earlier this year, and replacement of two roof sections of City Hall and the entire roofs at Water <br />Treatment Plants No. 2 and 3 (Well No. 5 and 6, respectively) is now just wrapping up. <br /> <br />Discussion: <br />The Roof Management Program recommends that full reroofing for the Community Center and <br />Water Treatment Plant No. 1 occur in 2012. A roof section over the kitchen at the Community <br />Center was recommended to be replaced in 2011, but City staff consulted with INSPEC (the City’s <br />roofing engineering consultant) who indicated that this section could be performed in 2012. In <br />addition, a section of the Public Works Maintenance Facility (over the original building) is also <br />recommended to be replaced next year, however, City staff is recommended a “repair as needed” <br />approach since the Capital Improvement Program includes demolition and reconstruction of this <br />building in 2016. <br /> <br />The Program estimates reroofing costs of $546,396 for the Community Center and $42,888 for <br />WTP No. 1. (A 5-year roof budget summary and roof inventory summary for the various <br />replacement schedules and costs are attached for reference). The estimate for the Community <br />Center is not current and most likely off by a factor of 2. Based upon the actual costs per square <br />foot for the City Hall project ($5.46/sq. ft.), the Community Center costs will likely be closer to <br />$250,000. The proposed 2012 Budget includes $250,000 under Special Projects (280-4180-7050) <br />for Community Center reroofing and $50,000 under the Water Enterprise Fund (700-4823-7050) <br />for WTP No. 1 reroofing. <br /> <br />City staff received a professional services proposal from INSPEC for reroofing of the Community <br />Center and WTP No. 1. The proposal phases and fees were broken down as follows: Design <br />($11,500), preparing plans/specifications ($13,700), bidding ($900), and construction <br />observation/testing ($12,000-$14,000) for a total estimated project fee of $38,100 to $40,100. <br />However, at this time only design and preparation of plans/specifications (bidding documents) are <br />needed (total $25,200). City staff will discuss more accurate fees with INSPEC for the bid and <br />construction after design progresses and bid documents are developed. A copy of INSPEC’s <br />proposal showing scope of work is attached to end of this report. <br /> <br />The estimate project costs for the 2011 Reroofing total $203,600 ($183,800 for construction and <br />$19,800 for engineering). The 2011 adopted Budget has $240,000 programmed for these <br />improvements ($175,000 from Special Projects and $65,000 from Water Enterprise Fund) leaving <br />a balance of approximately $36,400 for any design work associated with the 2012 Reroofing <br />project. The proposed 2012 funding aligns with the 2011 funding sources.
The URL can be used to link to this page
Your browser does not support the video tag.