My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2011/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2011
>
Agenda Packets - 2011/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:08 PM
Creation date
6/27/2018 1:48:39 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/2011
Supplemental fields
City Council Document Type
City Council Packets
Date
11/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />31 <br /> <br />CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804/Chapter 1303) <br />Land Disturbance Permit Fees:* <br /> <br />50 cubic yards or less…………………….......$29 <br />51 to 100 cubic yards………………….………$44 <br />101 to 1000 cubic yards……………….………$44 <br />for the first 100 cubic yards, plus $21.00 for each <br />additional 100 cubic yards or fraction thereof. <br />1001 to 10,000 cubic yards……………….…$226 <br />for the first 1000 cubic yards, plus $18.00 for each <br />additional 1000 cubic yards or fraction thereof. <br />10,001 to 100,000 cubic yards………..........$377 <br />for the first 10,000 cubic yards, plus $78.00 for each <br />additional 10,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more……….…..….$1,064 <br />for the first 100,000 cubic yards, plus $44.00 for each <br />additional 100,000 cubic yards or fraction thereof. <br />*Additional fees may be required for legal and consulting engineering costs incurred by the City <br /> <br />OTHER MISCELLANEOUS PUBLIC WORKS FEES <br /> (Actual time is rounded up to the nearest full hour) <br />Overweight/Oversize Permit Fees $50 daily per vehicle <br />$150 weekly per vehicle <br />$1000 annually per vehicle <br />Emergency Utility Locates No charge if during business hours, otherwise <br />actual time at call-out rate <br />Call-out Charge for Contractor Negligence <br />(lack of maintenance, traffic signs, etc.) <br />Actual time at Call-out Rates <br />Street Sweeping Charges Actual time at Call-out Rates + $100 per hour <br />Tree Removal/Trimming Contact City Forester <br />Water Tower Communications Fees: <br />Water Tower Access Fee No charge if during normal business hours, <br />otherwise 1 hour at Call-out Rate per visit <br />Plan Review and Inspection Fees Actual City, legal, and consulting engineering costs <br />($2,000 minimum) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.