My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/02/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/02/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:14 PM
Creation date
6/28/2018 7:41:58 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/3/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
2/3/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View Staff Report <br /> Highway 10 Pedestrian Bridge <br /> January 27, 1997 <br /> III Page 4 <br /> 3. Resolution of Drainage Issues: On September 3, 1996, the City Council discussed <br /> several options for dealing with the detention pond with City Engineer Rocky Keehn. The <br /> options are listed below: <br /> 1 - Sump manhole; no surge manhole $20,000 <br /> 2 - Sump manhole; with surge manhole $27,000 <br /> 3 - New pipes; no surge manhole $88,500 <br /> 4 - New pipes; with surge manhole $95,500 <br /> 5 - Bury storage including retention storage $165,000 <br /> 6 - Bury storage including no retention storage for sumps $233,000 <br /> 7 - New storm sewer $139,000 <br /> 8 - Do nothing $40,000 <br /> City Council directed that Option#2 be pursued and authorized a budget of$30,000 for <br /> construction plus $3,900 for design. This option would leave the pond in place but <br /> replace the material in the bottom of the pond so the water percolates into the ground <br /> more quickly. It also involves installing a sump manhole and surge manhole. It was <br /> expected that the cost would be paid from the Surface Water fund. To date, <br /> approximately$7,600 have been spent on engineering and development of alternatives, <br /> also from the Surface Water fund. This amount was not part of the $33,900 authorized by <br /> • City Council on September 3. <br /> The City Engineer has indicated that they have about 1-2 days worth of work to complete <br /> the redesign of the detention pond to incorporate Option#2. <br /> 4. Construction Bidding and Award, Completion of Bridge. <br /> * * * * * <br /> To date, the City has expended approximately $42,000 in engineering design and legal costs. It is <br /> unknown what the cost of the easement on the north side of the highway will be until the <br /> commissioners handling the eminent domain proceedings determine a value. The final cost on <br /> redesigning the detention pond so it remains in place but accommodates the bridge will be <br /> available once the final design is completed. <br /> potutibLsi)L.u. , <br /> Pamela Sheldon, Community Development Director <br /> cc: Mary Saarion, Parks&Recreation Director <br /> Mike Ulrich, Public Works Director <br /> Russ Nordstrom, 2536 W. County Road H2, Mounds View MN 55112 <br /> 0 C:\OFFICE\WPWIN\WPDOCS\SPECPROJ\HWYBRIDG\CCMEMO.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.