My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/02/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/02/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:23 PM
Creation date
6/28/2018 7:47:34 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/10/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
2/10/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View Staff Report <br /> Highway 10 Pedestrian Bridge <br /> February 6, 1997 <br /> 40 Page 3 <br /> temporary traffic control. These costs would be covered by the grant funds and the local match <br /> (80%federal,20% local). City Council Resolution No. 4843 allocated$190,000 to cover the local <br /> match, bridge design and inspection,and contingency as follows: <br /> Federal Local Source of Local Funds <br /> Bridge Construction $471,910 $117,977 Franchise Fee $82,642 <br /> Bridge Design&Inspection $ 65,000 Special Projects Fund $41,558 <br /> Contingency $ 7,023 General Fund $31,000 <br /> $190,000 Street Light Fund $25,000 <br /> Activity Fund $10,800 <br /> $190,000 <br /> Other costs identified in our earlier report included acquisition of easements and the redesign of the <br /> drainage pond at the corner of Long Lake Road and Highway 10. Items which have come to our <br /> attention since February 3 include utility modifications and undergrounding and traffic signal <br /> modifications,based on a meeting held between the consultant,NSP and MnDOT. An argument could <br /> be made that these items benefit the Highway 10 corridor as well as the bridge, and could be paid from <br /> the TIF funds which have been allocated to Highway 10. Suggested sources of funds for these items <br /> are noted below. <br /> Easements $3,849 (1) Contingency or TIF-Hwy 10 funds(?) <br /> Design work on drainage pond alternatives $7,600 Surface Water <br /> • Improvements to drainage pond $33,900 (2) Surface Water <br /> Utility Modifications;Undergrounding $30,000 TIF-Highway 10 funds(?) <br /> Traffic Signal Modification $10,000 TIF-Highway 10 funds(?) <br /> Sidewalk Connections;Additional Landscaping (?) Park Improvement funds <br /> $85,349 <br /> (1) Total cost of easement is not known at this time. Amount noted is total of legal bills received to date. <br /> (2) Of this amount,$30,000 is for construction and$3,900 for design work. <br /> The amount of money in the TIF-Highway 10 account for 1995-1997 is$680,775. The suggested amount to <br /> be paid from this account is$43,849,based on the above list. <br /> Total costs are approximately$750,000 based on the information known at this time. The amount <br /> which has been expended to date is approximately$55,168. <br /> Recommendation: Continue the discussion of this item to February 24, 1997 and direct staff-to <br /> publicize that this item will be on the agenda. Indicate to staff what additional information is <br /> needed by City Council for your next discussion of this item. <br /> Pame'I( kilkALttn - <br /> a Sheldon, Community Development Director <br /> cc: Mary Saarion,Parks&Recreation Director <br /> Mike Ulrich,Public Works Director <br /> Russ Nordstrom, 2536 W. County Road H2,Mounds View MN 55112 <br /> C:\OFFICE\WPWIN\WPDOCS\SPECPROJ\HWYBRIDG\CCMEMO.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.