Laserfiche WebLink
Ordinance 588 <br /> III January 27, 1997 <br /> Page 10 <br /> Subd. 2. Building Permits: Applicants proposing to erect wireless telecommunication towers <br /> and/or antennae shall obtain a building permit. The towers and antennae are subject to <br /> inspection by the City building official to determine compliance with Minnesota State <br /> Building Code construction standards. No building permit shall be issued by the City <br /> without prior approval of a CUP by the City Council if applicable. When no CUP is <br /> required, the applicant shall provide to the City all information as required by Section <br /> 1124.06, Subd. 1 of this Code at the time of application for building permits, in addition to <br /> that required by Section 1124.06,Subd 2a below. Building permits shall not be required <br /> for the repair, replacement, adjustment and/or alteration of the elements of antenna arrays <br /> if such work does not reduce acceptable safety standards. <br /> a. A report and plan from a qualified and registered engineer or firm that specifies <br /> and includes the following: <br /> L The tower height and design including a cross section and elevation. <br /> 2. The height above grade for all potential mounting positions for co-located <br /> antennae and the minimum separation distances between antennae. <br /> III 3. The capacity of the tower, including the number and type of antennae that <br /> the tower can accommodate. <br /> 4. The steps that the applicant will take to avoid interference with established <br /> public safety telecommunications. <br /> 5. An engineer's stamp and registration number. <br /> Subd. 3. Demonstration of Need: The applicant shall provide a diagram showing the cell site <br /> configuration illustrating the coverage area of the proposed wireless telecommunication <br /> tower and/or antenna. This diagram shall demonstrate the frequency re-use and spacing <br /> needs of the wireless system in order to provide adequate coverage and capacity to areas <br /> that cannot be adequately served by locating the antenna on an existing structure. <br /> Subd. 4. Proof of Insurance: The applicant shall provide the City with proof of liability <br /> insurance which protects against losses due to personal injury or property damage <br /> resulting from the construction or collapse of the tower, antennae or accessory equipment. <br /> Such proof shall be supplied to the City by the wireless telecommunication tower owner <br /> or lessee at the time of application and shall be made available to the City from time to <br /> time upon its request. <br /> SSubd. 5. Removal of Abandoned or Damaged Towers: Any wireless telecommunication tower <br /> and/or antenna that is not used for one (1)year shall be deemed abandoned and the <br /> property owner shall remove the tower and/or antennae in the same manner and pursuant <br />