Laserfiche WebLink
BEL-RAE COMMUNITY CENTER #90614MP <br /> III <br /> V.B. Diggs (Volleyball) <br /> Opinion of Probable Costs <br /> V.B. Diggs, New Construction <br /> Courts 16,400 sq.ft. x $55.00 /sq. ft. = $902,000.00_1 <br /> 1st floor commons/ancillary 5,400 sq.ft. x $55.00 /sq. ft. = $297,000.00 <br /> (v.ball toilets/concessions/corridor/support) <br /> 2nd floor commons/balcony 7,000 sq.ft. x $50.00 /sq. ft. = $350,000.00 • <br /> (open area/balcony/concessions) <br /> Ext. Wall Upgrade (V.B.Diggs 1 Is $40,000 = $40,000.00 <br /> Gymnasium 12,800 sq.ft. x $55.00 /sq. ft. = $704,000.00 <br /> (toilets/support0 <br /> Ext. Wall Upgrade (gym) 1 Is $25,000 = $25,000.00 <br /> Wood Floor Upgrade (gym) 1 Is $95,000 = $95,000.00 <br /> Teen Center/2nd Floor Loung 3,200 sq.ft. x $75.00 /sq. ft. = $240,000.00 <br /> ( 1st floor teen activity area/2nd floor lounge) <br /> Lobby/Entry/Corridor 3,300 sq.ft. x $95.00 /sq. ft. = $313,500.00 <br /> (main entry/lobby/corridor) <br /> Exterior activities 1 Is $25,000 = $25,000.00 <br /> Sitework (Wetlands) 1 Is $100,000 = $100,000.00 <br /> Parking _ 1 Is $100,000 = $100,000.00 <br /> Ill <br /> SUBTOTAL-New Construction Costs $3,191,500.00 <br /> SUBTOTAL $3,191,500.00 <br /> 5% Design Contingency _ $159,575.00 <br /> V.B.DIGGS CONSTRUCTION COST $3,351,075.00 <br /> I I I 1 <br /> 0 TOTAL CONSTRUCTION COST $5,629,286.25 <br /> Page 5 <br />