My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-1997 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
02-24-1997 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:34 PM
Creation date
6/28/2018 9:05:52 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/24/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
2/24/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> i• <br /> MEMORANDUM <br /> . MEMO TO: Mayor and City Council <br /> FROM: Michael Ulrich, Director of Public WorksA4' <br /> DATE: August 31, 1995 U <br /> SUBJECT: Pedestrian Bridge <br /> Park and Recreation Commissioner Dave Long spoke with me yesterday <br /> about any maintenance concerns I might have regarding the <br /> Pedestrian Bridge that is proposed for TH 10 . I explained that <br /> maintenance of the bridge is a concern and was addressed by the <br /> interview team with the consultants that replied to the RFP. <br /> During each interview questions were asked about snow rem Oral, <br /> graffiti, and painting. Each consultant responded that the bridge • <br /> would be designed to-require minimal maintenance . Concrete could-be <br /> colored to eliminate painting. Snow removal equipment would have <br /> adequate access and clearance for operation. <br /> - If this bridge were constructed, 'additional labor would be required <br /> to completely clear snow from the edges of the bridge following a <br /> snow storm. This would occur after the bridge has been cleaned <br /> initially, and would prevent snow on the edges from melting and <br /> freezing on the bridge deck. If chemicals are necessary for <br /> deicing, and noncorrosive materials would be a relatively small <br /> additional expense . <br /> Staff does not' expect that the maintenance of this structure will <br /> add a burden to the existing maintenance activities performed by <br /> the current staff. If Council has any questions concez-ning <br /> maintenance of the proposed bridge, please feel free to call me. <br /> M <br /> ATTACHMENT 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.