Laserfiche WebLink
• <br /> 0 City of Mounds View Staff Report <br /> Highway 10 Pedestrian Bridge- Appendices <br /> February 21, 1997 <br /> Page 3 <br /> 11/30/95 "Thanks for Hwy 10 bridge vote" (Letter to editor; Focus) <br /> 12/6/95 "Former mayor questions pedestrian bridge decision" (New Brighton Bulletin) <br /> 1996 <br /> 1/22/96 Adoption of Resolution No. 4889 appointing a citizen task force to select a design <br /> for the Highway 10 Pedestrian Bridge (regular meeting) <br /> 2/6/96 Meeting of Pedestrian Bridge Citizen Task Force; spiral ramp design selected <br /> pending discussions with landowners about easements <br /> 3/4/96 Consideration of engineering proposal for abandonment of surface water pond <br /> (TH 10 and Long Lake Road) (worksession); diagram showing spiral ramps <br /> included in packet. <br /> 3/25/96 Consideration of surface water pond abandonment at Long Lake Road& TH10; <br /> two bids presented for preliminary engineering work (regular meeting; staff <br /> requested it be tabled to April 1 worksession) <br /> 4/1/96 Staff report sent to worksession; outcome unknown since no minutes kept of <br /> 11111 worksession discussions. (worksession) <br /> 4/11/96 "Bridge project meets new roadblock; MV Square owner says view of center is <br /> impaired" (Focus) <br /> 6/10/96 Motion passed to authorize staff to sign agreement with SEH to complete <br /> engineering analysis to relocate surface water pond adjacent to Bridgeman's, for <br /> construction of the pedestrian bridge, for the amount of$6,900 to be funded from <br /> the Surface Water Management Fund, System Maintenance 420-4122-303, <br /> Professional Services (regular meeting) <br /> 6/19/96 "Pond near bridge site may be relocated" (New Brighton Bulletin) <br /> 9/3/96 worksession <br /> • Discussion of options for obtaining easements for Highway 10 pedestrian bridge <br /> • Review of surface water abandonment for pedestrian bridge construction <br /> 9/9/96 Motion passed to approve option#2 (re: surface water pond) and to authorize the <br /> staff to negotiate with the two engineering firms to determine who will do the <br /> work and to authorize the expenditure from Surface Water Management Funds up <br /> to $30,000 (regular meeting) <br /> 9/23/96 Adoption of Resolution No. 5009 initiating eminent domain proceedings and the <br /> use of the quick take process under Chapter 117 of the Minnesota State Statutes <br /> for an easement on a portion of the property located at 2535-2585 Highway 10 <br /> and identified by PIN#08-30-23-11-0079 for construction of a pedestrian bridge <br /> over Highway 10 (regular meeting) <br /> 0 11/21/96 Permit submitted to Rice Creek Watershed District by BRW <br />