Laserfiche WebLink
©IN DP REQUEST FOR COUNCIL CONSIDERATION Agenda Section <br /> I <br /> STAFF REPORT Report Number: <br /> Q'I�JJ ,SGC, Report Date: 9/9/96 <br /> • % CITY COUNCIL MEETING DATE <br /> �(. 'r'�7 September 9, 1996 Special Order of Bus. <br /> oB`°jt'PartneKN'"Qs Consent Agenda <br /> Public Hearings <br /> X Council Business <br /> Item Description: Pedestrian Bridge Surface Water Pond <br /> Administrator's Review/Recommendation: <br /> -No Comments to supplement this report X <br /> -Comments attached. <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: <br /> Staff spoke with Axis from BRW Inc. to request reviewal of the proposals submitted by SEH for the removal <br /> of the surface water pond adjacent to the Bridgeman's property. Of the first two options available, Aris <br /> preferred option two as this would allow an additional 1.5 to 2 feet of fill to the pond. Aris further suggested <br /> that approximately an additional $3,000 be added to the design to allow for some type of decorative rocks to <br /> placed around the stand pipes. This would enhance the aesthetics of the pond. <br /> At this point, staff would request authorization to negotiate design and construction engineering and <br /> management of the project with either SEH or BRW. Staff is in the process of scheduling a meeting with the <br /> wvo firms to discuss the best method of handling this part of the bridge project. Staff will seek Council's <br /> SiProof the additional project upon the completion of the discussions with both firms. <br /> val <br /> r,,, _ <br /> Michael Ulrich, Director of Public Works <br /> RECOMMENDATION: <br /> Authorize staff to negotiate services for design, construction engineering and management to implement <br /> option no. 2 for the removal of the surface water pond adjacent to the Bridgeman's property and present the <br /> ^ontract to Council for consideration. <br />