Laserfiche WebLink
_____ ___________________._ . . <br /> . 1 i <br /> ..,.. <br /> . .t , <br /> ,. <br /> Hbu- (( fi n _ j ,he, i r, /7 <br /> `'' ' • Mounds View <br /> s , <br /> Pond near bridge ' <br /> II site may be relocated <br /> Ti 1•' Study will surface water management fund. railing,"said Ulrich.Also of concern <br /> -1 ' If the study finds that relocation is is the extra maintenance needed to <br /> determine whether feasible, the cost for the actual remove garbage thrown pond <br /> two can co-exist nexpected to with the expected increase in public <br /> i I" rangerelocafromonof$the10,000pond tois$32,500 and activity around the new bintoridge.the <br /> 1. <br /> • <br /> 1+ would commence simultaneously Some council members,including <br /> , by Greg Schmidt with the bridge construction, which Julie Trude, said they would prefer <br /> 1 P - The Mounds View City Council Ulrich expects will begin in the relocation because of the unattractive- <br /> q;j June 10 authorized a study to deter- spring of 1997. <br /> I mine the feasibility of relocating a The new according Q ries of the current pond. When.the <br /> ' I-" drainage pond from the site of a Ulrich, will possibly location,be behindthebe bridge <br /> of 1995, Mayor Jerry Liroved inneal o <br /> j t ' planned pedestrian bridge over city'spublic works area, <br />•� ' ''I I Highway 10. Y east of the showed support for pond relocation. <br /> t Public Works Director Mike Phillips 66 station. "It's an eyesore and very dangerous <br /> t ry <br /> 1. Ulrich said work on the study will Expensive alternative for children,"said Linke. <br />• j( start immediately. If the SEH stud <br /> 11; with thestudy,Ulrich , <br /> 1 The city received two estimates pond should stay andpbe redesigned also inforoves that the Alonrmed the Pcoouncil about the <br /> lr� for the cost of the study:$7,620 from within the bridge area, that cost is change in the design of the bridge's <br /> '• BRW, Inc., the contractor awarded estimated to be at least S40,000. This entrance ramp. Originally the <br /> -• the pedestrian bridge project, and scenario would include a change to entrance was designed for a switch- <br /> $6,900 from Short-Elliott-Hendrick- the overall appearance of the bridge. back ramp,but has been changed to a <br /> i; j son, the city's consulting engineer. "The engineers have stated that spiral ramp. "It would be more user <br /> The council awarded the work to we're going to need some inside friendly and take up less room,"said <br /> SEH;based on its low bid.The study fencing.onthe inside railing to make Ulrich. The cost of the pedestrian 1 <br /> } will be financed through the city's it <br /> Y so people,can't jump. off the bridge is estimated at5600,000. <br /> i ‘ <br /> a <br /> 11 <br />; <br /> 4IP <br /> 1 <br /> I <br /> i <br />