My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1997/06/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
Agenda Packets - 1997/06/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:15 PM
Creation date
6/28/2018 2:54:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/2/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
6/2/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TIM 71 <br /> ems -sm� ,A •1. � <br /> Page 4 • <br /> April 28, 1997 <br /> Mounds View City Council <br /> Bill Werner,2765 Sherwood Road,asked about the status of the Bel Rae. He asked if a report has been <br /> obtained from the architect as to the structural and environmental status of the building. He is concerned that <br /> the architect has an interest in the building and will basically tell the council what he feels they want to hear. <br /> He feels the city should obtain a detailed report including costs,etc.and that the city should hold them <br /> accountable to those cost estimates. <br /> Mayor McCarty explained that the costs are dependent upon market costs and therefore,very difficult to <br /> predict. The architects can only estimate what they think the costs will be. <br /> PUBLIC HEARINGS: <br /> Public Hearing and First Reading of Ordinance No.599,an Ordinance Approving a Rezoning from B- <br /> 2 to Planned Unit Development(PUD)for commercial uses for property located southeast of the <br /> Highway 10/Silver Lake Road intersection(2704-2740 Highway 10 and 7801 Silver Lake Road). <br /> Mayor McCarty opened the Public Hearing at 7:40 p.m. <br /> Ms.Pam Sheldon,Community Development Director,provided a brief overview of the project. She noted <br /> that the action before council would be for a rezoning. This would be the public hearing for the rezoning,and <br /> if the council wished,they could approve the first reading of the ordinance. The second reading would take • <br /> place at the next council meeting. Ms. Sheldon outlined the Planned Unit Development process that is <br /> required. She noted that the application is at a general concept plan stage and that this step allows the <br /> applicant to get a reading from the council and the community on whether there is agreement that this type of <br /> development should go forward,in general terms,before the applicant spends a lot of investment in <br /> engineering drawings and more detailed planning. This gives the community a chance to give input on the <br /> types of uses and their approximate arrangement. She noted that she had outlined three different options for <br /> the council to review. These included: <br /> 1) that the Council conduct the Public Hearing,close the hearing and proceed to introduce the Ordinance for a <br /> first reading with an exhibit that would be attached to the ordinance that would have a detailed list of rules <br /> about what will happen at the next stage; <br /> 2) that the hearing be conducted,and continue it at another time,asking the applicant to get information on the <br /> wetland boundaries,the drainage design,whether the underground parking is feasible and do some additional <br /> design work before the first reading of the ordinance(which could be held at the first council meeting in June); <br /> 3) that the council deny the request and tell the applicant that they can re-apply when they get the additional <br /> information. <br /> Ms. Sheldon proceeded to outline areas of the ordinance including Exhibit 1 which lays out the rules the <br /> development would need to go by at the development stage and when it is actually constructed. <br /> Mr.Jim Ericson,Planning Associate,went through the discussion topics related to the development including <br /> the consistency with the Comprehensive Plan,the Highway 10-Area 9 Study,the land uses, the tax impact of <br /> the project,the overall project design,access and on-site circulation,traffic study,the drainage plan,natural <br /> features and open space,encroachment into the Wetland Buffer,drainage and utility easements,parking,trash <br /> disposal, snow storage,Site Improvement Agreement,and the effect on abutting properties. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.