Laserfiche WebLink
Item No. <br /> Staff Report No. 7 c 7 / LOS <br /> Meeting Date: <br /> • Type of Business: <br /> WK: Work Session;PH:Public Hearing; <br /> CA: Consent Agenda;CB:Council Business <br /> City of Mounds View Staff Report <br /> To: Honorable Mayor and City Council <br /> From: Michael Ulrich, Director of Public Works /tt <br /> Item Title/Subject: Second Quarter Report <br /> Date of Report: August 1, 1997 <br /> WATER <br /> Trouble shot and repaired meters <br /> Flushed hydrants <br /> Three employees attended the annual Water Certification Seminar <br /> Conducted tours of the Water plant for Public Works Week <br /> Repaired two water main breaks <br /> Extensive locations performed for Old 8 project <br /> Pumped 147,635,000 gallons of water <br /> STREETS <br /> Crack sealed streets <br /> Trimmed boulevard trees <br /> Cleaned up storm damaged boulevard trees <br /> Assisted in repairing water main breaks <br /> Patching streets in preparation of seal coating <br /> SHOP <br /> Assisted in crack sealing <br /> Assisted in street sweeping <br /> Assisted in patching <br /> Squad Car maintenance and repair <br /> City Hall HVAC maintenance and repair <br /> Public Works vehicle and equipment repair and maintenance <br /> Initiated installation of auto lube system on unit 4133 <br /> WASTEWATER <br /> Assisted New Brighton, Lino Lakes and Circle Pines in sewer related maintenance <br /> Televised main lines for two residential service wyes <br /> Dye tested residential service line <br /> Removed root cutter lost in main line by a contractor <br /> Installed new track on camera traction unit <br /> Rebuilt motors and pumps at Groveland Lift Station <br /> Assisted Townsedge Mobile Home Park with sewer blockage <br /> Cleaned and Inspected storm sewer on Spring Lake Road(3,500ft cleaned, 20 yds material removed) <br /> I <br />