Laserfiche WebLink
Cable cornp4n Franchise� <br /> Renewal P oposäl <br /> At its August 1997 meeting,the North Suburban Cable Commission voted to :otnmend approval of the franchise renewal proposal from <br /> Meredith Cable to its member cities,Once the final franchise ordinance embodying the.roposal is drafted,It will be taken to the cities for their approval. <br /> The current franchises expire in November 1997. I <br /> Responding to the needs assessment conducted last year by the Cable Comn fission,the company has proposed to upgrade the current 450 MHz, <br /> 65-channel system to 750 MHz using hybrid fiber-coaxial cable architecture.The cumpa y plans ti offer 81 channels of analog video programming and <br /> reserve 200 MHz for additional video channels and digital services.In additio to enabli g the company to offer more programming services,the new system <br /> will provide cable subscribers with higher signal quality and more reliability. <br /> Assuming approval of the franchise by the cities,construction of th new sys m is expected to begin nett spring. <br /> Proposa Sum 'ry <br /> Subscriber System Upgrade Commitment to Community Television <br /> •glee subscriber system will be upgraded from the current 450 The company will continue to comply with existing agreements <br /> MHz,65 Channel system to a 750 MIIz system.Initially,the company will I regard g support for community television,Including: <br /> activate 550 MHz for 81 channels of analog video channels.The remaining *Agreeing to maintain the current number(12)of community <br /> Wiz will be reserved for additional video channels and digital services. access •fanners.Further the Cable Commission will retain control over the <br /> I <br /> will mean that the Cable Commission will be able to reclaim loaned entire Mhz of spectrum that currently equals one video channel.This will <br /> community channels from the company. becom very important when digital compression technology is introduced <br /> *Me system will be rebuilt using a hybrid fiber-coaxial cable becau .it will give tate Cable Commission/CIV control over whether to com- <br /> architecture.The fiber will initially be taken down to nodes of approximately press t e signal and by how much. <br /> 2,000 homes with a miniinutn 16 fiber count,but the nodes will be designed •Malntalning Its financial support of community television,which <br /> to be capable of migrating to 500 homes with a minimum four fiber count as include the operating grant for CIV North Suburbs,the annual$50,000 <br /> digital services are provided.The increased use of fiber,along with improve F..quip ent Replacement Grant,and the Scholarship Grant,which may now <br /> ments in the electronics in the system,will give subscribers more reliability be use) for student internships,The company also agreed to provide an <br /> and higher signal quality. additi' al$667,286 for equipment replacements over the 151car life of the <br /> *The system will no longer use"channel mapping"for the Basic (ranch•-,beginning with$40,000 in the first year and increasing by 1.5% <br /> programming services,so that all of the local VHF broadcast signals will be each y •r thereafter.This additional equipment funding will help defray the <br /> loatted"on channel"for all customers,regardless of whether they use a con- cost o replacing Van 1 and the DiTech switcher in Master Control and of <br /> vertex box ur nut.Pur example,if you have a cable-ready television and do makin: the transition to digital editing and playback equipment. <br /> not use a converter,WCCO-Channel 4 is located on channel 28 of the cable • <br /> system,The purpose for channel mapping is to avoid problems caused when Institutional Network <br /> the over-the-air broadcast signal leaks into the c able system.The use of fiber *The company will add to and improve electronic equipment on <br /> optics and the need fur fewer sigrral amplifiers makes channel mapping the exi ting coaxial institutional network to increase its performance and <br /> unnecessary, reliabi ty, <br /> •The company,vill interconnect this able system with other in addition,four fibers on the subscriber network will be <br /> commonly owned,adjacent systems in the metro area.This will enable pro- resew d for use by public institutions,including cities,schools,and libraries. <br /> gram sharing and other kinds of communication with other access facilities, *The company has also agreed to meet mutually acceptable tech- <br /> Oas the Ramsey/Washington Cable Commission(Suburban Community nical a d performance standards for the Institutional Network <br /> neis), <br /> *The company plans to begin design and"walkout"and to pull High Speed Data Transmission <br /> permits wlthing 90 days of the approval of the new franchise.The intent is to <br /> complete the project by November 30,2000,although they will aggressively •In addition to traditional video services,the system will be aapa• <br /> work to substantially complete construction by November 30,1999. hie of roviding high speed data services to business users. <br /> —Coralle Wilson <br />