My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-06-1997 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1997
>
10-06-1997 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:23 PM
Creation date
6/29/2018 6:46:56 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/6/1997
Supplemental fields
City Council Document Type
City Council Packets
Date
10/6/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
presented as$50,000. This will be reduced to$25,000. Another line that will deserve some thought <br /> will be the community center transfer. Ideally this shouldn't have to continue after 1998, but with <br /> the anticipated tight operating budget for the community center, we may need to see that continue. <br /> For now, we felt it had to be left in the budget. <br /> Additional items that can be changed will be. These include the likelihood of changing auditing firms <br /> at a savings of a few thousand dollars(on the work session agenda). There is also a state action that <br /> is providing some aid regarding pensions which we have not had in the budget to date (Bruce can <br /> review). Also, the receptionist position being open, we reviewed our options on this and agreed to <br /> try to rearrange our office space and not replace the position at this time, but with an option to do <br /> so if necessary. Because there is an intern position budgeted in Community Development, we decided <br /> to add the budgeted amounts of these two positions, and divide by two, assuming the intern position <br /> will go forward with analysis of the receptionist need to be evaluated later. This will simply give us <br /> some flexibility in an otherwise tight situation. It may also be viewed at intern funds for the city <br /> administrator if that is determined to be necessary and a receptionist is not needed. <br /> These are the short term changes that can be made and Bruce will develop the figures to see the end <br /> result. Additional considerations were made and I will review them here. <br /> First, a fund transfer will need to be made to reconcile the MSA account. Bruce will address the best <br /> way to go about this, but that may be an additional draw on general fund balances (not necessarily <br /> the 1998 budget though). Also, a few community development issues could be worked on by the new <br /> director. Raising building permit fees, passing through development review costs to the developer, <br /> and defining a cost scope of updating the comprehensive plan (something due next year and has <br /> $5,000 available from the Met Council) are three that could help in cost control. Suggestions were <br /> also made to review some personnel pay practices. Spreading out the step schedule for new hires <br /> should be viable. City policy also attempts to correlate staff pay levels to Stanton levels, something <br /> that in reality isn't happening but should be decided upon within affordable limits of the City. To do <br /> this, I have asked Bruce and Lynette to conduct a market study of pay, and include critiquing step <br /> levels, bench marking and cola increases in order to assess where the City's policies are relative to <br /> the City's ability to pay. With this taking place, the City simply has to get going on the Hay <br /> evaluation. <br /> Other suggestions include contacting other cities to possibly share housing inspection needs, reduce <br /> the amount of snow plowing to save costs, reducing the cost of maintaining the City's web site and <br /> looking into recreation fees and operations. Questions regarding two positions, the Economic <br /> Development Director and the Human Resources Technician were also raised. The EDA Director <br /> position is paid for out of TIF funds except for 10%,which according to actual work is now probably <br /> low. My position is that my work without the EDA Director would be severely strained in managing <br /> and coping with development projects, and secondly but just as importantly, Cathy Bennett plays a <br /> key role in providing a second head in general management matters with me in City Hall. My time <br /> simply does not allow me to address common problems and issues effecting day to day operations, <br /> at least at the levels that appear to be expected. As for the HRT position, its value is administrative <br /> in simply keeping track of the volumes of personnel related functions that take place. This work has • <br /> to be done as there is no one else to do it. Other functions such as recycling have been assigned to <br />
The URL can be used to link to this page
Your browser does not support the video tag.