My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/08/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/08/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:26 PM
Creation date
7/2/2018 8:37:44 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/8/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
8/8/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Weather and scheduling permitting the slurry sealing will begin the third week of <br />August. We will be asking residents on those streets that will be sealed, via the <br />newsletter to comment on this method. Hopefully responses will be positive. <br />Staff repaired another water leak on Wednesday. At the time of this writing is was <br />not known whether it was a main or service. The location was on Longview. <br />Reconstruction of Pleasantview Drive began on Tuesday. The contractor seems to <br />be working toward early completion. If all goes well, and at the same pace as they <br />are currently moving, it could be completed in a month or so. That is good news <br />for all parties concerned. <br />The treatment plant revisions contract was finalized this week. All punch list items <br />were corrected. Staff is having a slight problem with the dehumidifiers at both <br />plants, but it is not the contractors responsibility. Sand had been getting into the <br />piping, from the filter at plant #3. The water plant operators seem to have located <br />the problem. It seems that part of the underdrain has either broke or deteriorated. It <br />has been so busy around here that we haven't had time to fully exam the problem. <br />Water usage has been well within our pumping capacity, so staff has not pumped <br />well #6. Repairs are anticipated to be performed in a couple of weeks. <br />Staff met with consultants from SEH and NSP last week to discuss the energy <br />audit for the city facilities. Staff expects to have results of the audit around <br />December 1. This late date is required because the heating plants in all the <br />buildings must be operated in order to determine their efficiency. <br />Construction of the Police parking lot began on Wednesday with a location meeting <br />to determine where the underground utilities are. Removals of existing asphalt and <br />subgrade prep should continue the rest of the week. <br />Mike <br />GREENFIELD ESTATES - HARSTAD <br />Staff will be making an on -site visit to the Greenfield Estates project on Friday, <br />August 5, 1994 to inspect the work required to be done prior to issuance of <br />building permits for the project. As of Thursday, only one item remained to be <br />completed. Staff anticipates that the items will be completed in a satisfactory <br />
The URL can be used to link to this page
Your browser does not support the video tag.