My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/11/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/11/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:57 PM
Creation date
7/2/2018 9:03:43 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/7/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
11/7/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMSTOCK &DAVIS, INC. <br /> Consulting Engineers&Land Surveyors <br /> November 2, 1994 1446 County Road J <br /> (85th Ave.N.E.) <br /> Minneapolis, <br /> Paul Harrington Minnesota <br /> Community Development Director 55432 <br /> City of Mounds View <br /> 2401 Highway 10 <br /> Mounds View, MN 55112 • 612 784-9346 Tel. <br /> • 612 784-9395 Fax. <br /> Re: Sherwood Estates <br /> Preliminary Plat <br /> Dear Paul, <br /> I have reviewed the concerns expressed by Rocky Keehr in his letter of October <br /> 24, 1994 to you. The specific concerns to be addressed are the possibility of <br /> problems in house basements, or non-stop pumping (sump pumps) , and saturation <br /> and weakening of the subgrade of the street. <br /> Existing homes outside the plat will not be adversely affected by the runoff <br /> from the plat, or runoff changes as a result of the plat. This is due to the <br /> fact that the theoretical 100 year - 24 hour storm, and the theoretical 100 <br /> year - 10 day runoff elevations will not be changed by the proposed plat. In <br /> fact, the actual volume of water that needs to soak into the ground will be <br /> reduced. Also, the roadway construction and storm drain construction will <br /> provide an additional overflow for the landlocked area. <br /> The soil (coarse Alluvium) in the area of the ponds has a high permeability <br /> rate and will allow any water that does pond to quickly soak into the ground. <br /> Observation of the soils in soil cores has shown the soils to remain <br /> relatively dry or moist and not saturated, even immediately after heavy <br /> rainfalls. To my knowledge, no ponding has been observed in the low areas. <br /> The water table in the area of the ponds is at elevation 901 to 903. The <br /> lowest floor elevation allowed in this area shall be 907 (per Rice Creek <br /> Watershed District) . It is anticipated that because of the permeability rate <br /> of the soil, the water will not be in the ponding areas long enough to cause <br /> any problems in most of the basements. In the case of Lot 4, Block 1; Lot 2, <br /> Block 2; and Lot 4, Block 3, the close proximity to the ponds may necessitate <br /> raising the lowest floor elevation and/or providing sump pumps. Because of <br /> the history of the water table for the entire Mounds View area, it may be <br /> prudent to provide sump pumps (as most builders do routinely) in all the <br /> houses or raise the lowest floor elevation. <br /> The lowest point in the roadway (909.75 at centerline) is over 50' from the <br /> nearest ponding area. Coarse Alluvium soils are relatively stable, even when <br /> saturated. Since fill for the roadway will either be granular borrow or the <br /> coarse Alluvial soils from on-site, no problems with saturated or weakened <br /> subgrade are anticipated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.