Laserfiche WebLink
3RD QUARTER REPORT <br /> PAGE TWO <br /> Streets Department <br /> - Installed/replaced 20 plus miscellaneous street signs, stop <br /> signs and no parking signs. <br /> - Supervised and inspected Street Patching and Slurry Coating. <br /> - Contractor removed and replaced (3) parking lots at Well 3 , 4 <br /> & 5. <br /> - Removed and replaced crosswalks at: <br /> Quincy to Adams <br /> Greenfield Place <br /> Spring Lake Road to Pleasant View Court <br /> - Purchased Street Sign Lettering system and aluminum blanks. <br /> - Installation of Catch Basin adhesive yellow marking tape. 1/3 <br /> of the City is completed. <br /> - Lot Lines is painting the Crosswalks, City Hall Parking Lot <br /> and Shop Parking Lot. (Not completed a/o 10-11-94) <br /> - Reconstruction and repair of (12) Catch Basins for Storm Water <br /> System. <br /> - Cleanup after wind storm. This included chipping, hauling <br /> brush and cutting of wood. <br /> - Landscaped Police Parking Lot and new Ballfield. <br /> - Assisted in the repair of (2) Water Main Breaks. <br /> Shop Department <br /> - Retrofitted the radar units in the squads. <br /> - Prepared vehicles and equipment for the winter season. <br /> - Performed routine and preventative maintenance on the fleet. <br /> - Kept inventory of auto parts, equipment parts, fluids, tires <br /> and fuels up to date and ordered. <br />