My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1995/08/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
Agenda Packets - 1995/08/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:25 PM
Creation date
7/2/2018 9:42:43 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/7/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
8/7/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CM OF <br /> REQUEST FOR COUNCIL CONSIDERATION Agenda Section: <br /> O i STAFF REPORT Report Number: <br /> ��� AGENDA SESSION DATE August 7,1995 Report Date: 7-31-95 <br /> DISPOSITION <br /> Item Description: <br /> 1995 2nd quarter report for the Public Works Department <br /> Administrator's Review/Recommendation: <br /> - No comments to supplement this report <br /> - Comments attached. <br /> Explanation/Summary (attach supplement sheets as necessary.) <br /> SUMMARY; The following is the 2nd quarter report for the Public Works Department. Staff will be in attendance <br /> at the work session should Council have questions or concerns. <br /> 2ND QUARTER REPORT, 1995 <br /> SEWER <br /> *Cleaned 139,380 feet of Sanitary Sewer <br /> *Cut 880 feet of roots out of the Sanitary Sewer System <br /> *Raised (2) manholes <br /> *Trained (4) employees on the Jet Truck and its operation <br /> *Painted Groveland Lift Station (outside) <br /> *Attended workshop at Warning Lites <br /> *Assisted on flushing of the mains <br /> *Assisted in "Public Works Week" tours, 156-3rd graders, May 25 <br /> WATER <br /> *Installed flow control pressure reducing valve at Well #6 <br /> *Installed sand separator at Well #6 <br /> *Inspected Well # filter tank support grid for damage <br /> *Repaired (7) hydrants and painted <br /> *Cleaned backwash pit at Treatment Plant #1 <br /> *Flushed mains in May <br /> *Attended Water School, April 4-6 <br /> *Attended workshop at Warning Lites <br /> *On-peak controlled day in June - Shut down all wells <br /> *Well's #1 & 2 pulled for inspection, put back on-line April 14 <br /> *Pumped 130,817,000 gallons of water <br /> *Installed P.R.V. Valve and Flushing Tee at Well #1, before start-up <br /> *Assisted in "Public Works Week" tours, 156-3rd graders, May 25 <br /> STREETS/STORM WATER <br /> *Attended workshop at Warning Lites (Mark and Tim F.) <br /> *Attended public works workshop at League of MN Cities (Gary/Tim F.) <br /> *Assisted in "Public Works Week" tours, 156-3rd graders, May 25 <br /> *Filled pot holes (approximately 3 1/2 weeks of major repairs) <br /> *Swept streets <br /> *Set up streets designated for slurry sealing <br /> *Installed (7) crime watch signs for the Police Dept <br /> *Completed the street rating program <br /> *Installed and/or repaired (12) street and traffic control signs <br /> *Complete boulevard sod repairs (plow/tractor damaged areas) <br /> *Assisted Parks Dept with irrigation (misc and repairs) <br /> *Cleaned catch basins <br /> SHOP <br /> *Assisted in "Public Works Week" tours, 156-3rd graders, May 25 / <br /> *Performed vehicle and equipment repairs/maintenance as needed 7� ✓ <br /> Michael Ulrich., Director of Piihl-Lc <br /> Wrknrk, <br />
The URL can be used to link to this page
Your browser does not support the video tag.