Laserfiche WebLink
Project Work Program <br /> Continued :o <br /> • Prepare displays for City offices for view by <br /> public. <br /> Deliverables: Colored layouts, architectural renderings and photo <br /> simulations of <br /> Input on Alternative Selection <br /> Key Staff: Ayaz, Pakalns, BRW <br /> Task A6.0 - Geotechnical Services <br /> Description: Obtain soil borings for each of the bridge <br /> substructure units and provide foundation pile 111 <br /> recommendation. <br /> Subtasks: • Drill foundation borings at proposed bridge <br /> substructure locations. . <br /> • Study and recommend pile type and length for Aim <br /> each of the substructure units. <br /> • Prepare report discussing exploration program, <br /> data obtained and foundation <br /> recommendations. <br /> Deliverables: Geotechnical Subsurface Investigation <br /> Soil Boring Logs <br /> Discussions and Recommendations <br /> Key Staff: Rudd, AET <br /> Task A7.0 - Feasibility Report <br /> Description: Prepare a feasibility study report evaluating bridge <br /> alternatives. <br /> Subtasks: • Determine and evaluate bridge alternatives <br /> • Prepare cost estimate for each alternatives <br /> • <br /> • Discuss advantage/disadvantage for each <br /> alternative • <br /> • Present study for review and discussion by the <br /> City r <br /> BRW, Inc. Pedestrian Bridge Over TH 10 <br /> Qum 8 <br />