Laserfiche WebLink
Project Work Program <br /> Continued <br /> Deliverables: Landscape final plans • <br /> Landscape specifications <br /> Key Staff: Harrington, Behringer, BRW <br /> Task B3.0 - Special Provisions and Construction Bid Proposal <br /> • <br /> Description: Prepare supplemental specifications unique to the <br /> project that would-not b e-Mn/_a• <br /> Standard Specifications for Construction. Prepare <br /> Construction Bid Package (Proposal). <br /> Subtasks: • Determine all materials or construction ,12111 <br /> procedures not included in Mn/DOT Standard <br /> Specifications for Construction. • <br /> • Provide detail specifications for each unique <br /> material or procedure, criteria to be followed <br /> and method of measurement and payment. <br /> • Obtain and incorporate as necessary City <br /> utility specifications and details, together with <br /> methods of measurement and payment. <br /> • Identify and incorporate any unique General <br /> Requirements and Covenants that may be <br /> necessary. <br /> MEI <br /> • Prepare special provisions, (Division SB). <br /> • Prepare construction bid package <br /> Deliverables: Bid Package <br /> Key Staff: Ayaz, Green, BRW <br /> • <br /> all construction inspection, material testing <br /> Task C - Construction Description: Perform p <br /> Engineering and survey activities during the lifetime of the <br /> construction phase of the project <br /> Subtasks: • Provide precise horizontal and vertical controls <br /> for all construction items <br /> BRW, Inc. Pedestrian Bridge Over TH 10 <br /> #21801 10 <br />