My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1995/12/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
Agenda Packets - 1995/12/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:39 PM
Creation date
7/2/2018 10:36:59 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/11/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
12/11/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Exhibit A, consisting of_pages, referred to <br /> in the Agreement Between Owner and Engineer for <br /> Professional Services, dated as of <br /> Initials: <br /> OWNER <br /> ENGINEER <br /> Scope of Work and Schedule <br /> • <br /> Task A- Bridge Type Study and Feasibility Study Report <br /> Task A1.0 - Project Coordination <br /> Description: Maintain project control through internal team meetings, team meetings with City staff and through other <br /> forms of communication. <br /> Subtasks: • Schedule and conduct initial meeting of Project Team, City and possibly Mn/DOT staff. <br /> - Identify roles of key personnel and establish communication procedures <br /> - Review and concur with responsibilities of consultant and City <br /> - Establish submittal requirements, review dates and overall project schedule <br /> • Establish need and frequency of ongoing Project Team meetings/ reviews. Participate in meetings <br /> and document meeting minutes. <br /> • Monitor progress and manage BRW staff and subconsultants. <br /> Deliverables: Project Schedule - Chart <br /> Meeting Minutes - Memoranda <br /> Status Reports - Memoranda <br /> Key Staff: Ayaz, Maves, Pakalns, BRW <br /> Task A2.0 - Project Initiation and Research <br /> Description: The initial phase of the project devoted to obtaining and analyzing available data for use in project design. <br /> Subtasks: • Data Research <br /> - Obtain as-built and proposed future development plans for TH 10 under proposed pedestrian <br /> bridge. <br /> - Obtain as-built utility plans (public and private) <br /> - Obtain proposed city utility improvements and drainage studies <br /> • Data Analysis <br /> - Analyze data obtained for applicability to project <br /> - Disseminate data to appropriate staff for use in design <br /> Deliverables: None <br /> Key Staff: Ayaz, Maves, BRW • <br /> Task A3.0 - Base Mapping/Supplemental Field Surveys <br /> Description: If available, obtain planimetric mapping and Digital Terrain Model from City of Mounds View and prepare <br /> data for design application. <br /> Subtasks: • Obtain electronic files of mapping and DTM. <br /> MOUNDSV.JH 1 Rev. November 21, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.