My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1995/12/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
Agenda Packets - 1995/12/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:39 PM
Creation date
7/2/2018 10:36:59 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/11/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
12/11/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task B3.0 - Special Provisions and Construction Bid Proposal <br /> Description: Prepare supplemental specifications unique to the project that would not be found in the Mn/DOT Standard <br /> Specifications for Construction. Prepare Construction Bid Package (Proposal). <br /> Subtasks: • Determine all materials or construction procedures not included in Mn/DOT Standard Specifications <br /> for Construction. <br /> • Provide detail specifications for each unique material or procedure, criteria to be followed and <br /> method of measurement and payment. <br /> • Obtain and incorporate as necessary City utility specifications and details, together with methods of <br /> measurement and payment. <br /> • Identify and incorporate any unique General Requirements and Covenants that may be necessary. <br /> • Prepare special provisions, (Division SB). <br /> • Prepare construction bid package • <br /> Deliverables: Bid Package <br /> Key Staff: Ayaz, Green, BRW <br /> Task C - Construction Engineering <br /> Description: Perform all construction inspection, material testing and survey activities during the lifetime of the <br /> construction phase of the project <br /> Subtasks: • Provide precise horizontal and vertical controls for all construction items <br /> • . Provide line and grade control stakes for utility construction <br /> • Maintain contractor scheduling and staging <br /> • Provide full-time inspection during bridge construction activities <br /> • Maintain as-built conditions drawings <br /> • Concrete cylinder breaks <br /> Key Staff:. Green, BRW; Rudd, AET <br /> See Project Schedule attached. <br /> BRW, Inc. MOUNDSV.JH <br />
The URL can be used to link to this page
Your browser does not support the video tag.