My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1995/02/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1995
>
Agenda Packets - 1995/02/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:18 PM
Creation date
7/2/2018 10:49:18 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/6/1995
Supplemental fields
City Council Document Type
City Council Packets
Date
2/6/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for a upgrade in their certification while attending. <br /> • Tim Pittman is installing a automatic grease system on the Jet Truck as time <br /> permits. This system lubricates almost every grease point on the truck and <br /> mounted equipment every 13 minutes. The addition of this system reduces <br /> time spent on preventative maintenance, allowing more time for production, <br /> and assures proper lubrication of critical parts. Operators do not have to <br /> climb on equipment to grease areas, thus increasing our safety practices. <br /> * Larry and Wally are performing sanitary sewer manholes inspections. Data <br /> gathered from this task will provide staff with valuable information regarding <br /> rehabilitation needs. T-his-report witl atso Increase productivity-in-per-for ming <br /> televising operations. <br /> • Bill Hanggi and Bill Hanson have been receiving a crash course on Lotus and <br /> data input on the new laptop. The addition of this computer already has <br /> increased the efficiency in calculating chemical usage, testing results, Dept <br /> of Health reporting and records retention. Although what seems like endless <br /> hours have been spent revising the ordinal worksheet, the men are especially <br /> impressed with the results of their labors. It seems like we finally have the <br /> worksheet developed, and they find another application that the computer <br /> can be useful. <br /> * Staff has scheduled a preconstruction meeting with Thein Well Co. for <br /> Monday, February 6th, after which they will begin to pull well number 2. <br /> Staff had originally planned to start this project with well one, but the flow <br /> control / pressure reducing valve must be replaced. A new valve has been <br /> ordered and should be received in the near future. Staff is performing the <br /> task of replacing this valve in-house, to save time and expenses. Similar <br /> valves need to be replaced at the Booster Station, and Wells 5 & 6. These <br /> valves were installed during the ordinal construction of these plants and have <br /> merely worn out. <br /> Mike <br />
The URL can be used to link to this page
Your browser does not support the video tag.