Laserfiche WebLink
-2- <br /> Shop: <br /> *Designed Squad #931 to match #941 and #942 <br /> *Mounted Auto-Lube System on the Vactor <br /> *Repaired #941 Front Bumper Cover, Reinforcement Bar, Molding, Isolator, Reinstalled Push <br /> Bar and Lights <br /> *Installed new Diesel Fuel Pump <br /> *Assisted in Break-room Remodeling <br /> *Attended: <br /> Tire Repair Seminar <br /> Competent Person Training <br /> Elgin Sweeper Clinic <br /> Turf Maintenance Pesticide School <br /> *Assisted in (2) Water Main Breaks <br /> *Assisted in City Projects (ie. Panels at PD) <br /> *Cleaned and modified DARE Vehicle <br /> Streets/Storm Water Department: <br /> *Installed Load Limit Signs <br /> *Sanded Sidewalks <br /> *Opened all Storm Drains, TWICE <br /> *Filled Pot Holes (40-60 hours) <br /> *Attended: <br /> NSP Safety Seminar <br /> Elgin Operators Seminar <br /> Bike Trail Seminar (in conjunction with Parks Department) (Gary) <br /> Concrete Training Seminar <br /> Hazardous Waste Seminar (3 days-Mark) <br /> Hazardous Waste Seminar (1 day-Mark) <br /> Turf Maintenance Pesticide School (Tim F.) <br /> Sealcoating Seminar <br /> *Constructed Security Gate for the Police Department <br /> *Began Street Rating Program with SEH (Pavement Management Program) <br /> *Assisted on (4) Water Main Breaks <br /> *Installed and/or repaired (6) Street and Traffic Control Signs <br /> *Assisted in Remodeling of Breakroom <br /> *Began Boulevard Repairs <br /> *Assisted in Training New Employees <br /> Water Department: <br /> *Installed a new Pressure Reducing Valve at Well #1 <br /> *Removed Pump from Wells #1 and 2 for Inspection and Repair. (Wellhead Maintenance) <br /> *Purchased new Personal Computer for Water Readings and Testing <br /> *Repaired (5) Water Main Breaks. (Still have (1) to fix on Spring Lake Park Road) <br />