My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/02/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/02/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:28 PM
Creation date
7/3/2018 7:21:43 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/14/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
2/14/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL PROPOSAL <br /> "B.J." HOUSE DOCTOR <br /> 15401 SUNFISH BLVD <br /> RAMSEY, MN. 55303-4578 <br /> (612) 323-9245 <br /> 8 FEB., 1994 <br /> KINYON RENTAL PROPERTIES <br /> 5312 RAYMOND AVENUE <br /> MOUNDSVIEW, MN. 55112 <br /> CONSTRUCTION OF ATTACHED GARAGE: Construct a 16" by 26" attached garage. <br /> FOUNDATION AND CEMENT: <br /> Frost footings and excavation: 1085.00 <br /> Block walls and anchors 828.00 <br /> Concrete floor and 2 foot apron 792.00 <br /> SUB TOTAL each $2705.00 <br /> Driveway to street, with attach to existing sidewalk. 800.00 <br /> TOTAL EACH UNIT-based on separate construction dates $3505.00 <br /> FRAMING, INCLUDING ALL HARDWARE AND TRIM, READY TO OCCUPY: <br /> The proposed construction is based on matching the unit at 5312 Raymond in style and design. <br /> This estimate is based on good "Rule of Thumb", for this unit only. The more complicated <br /> Roof structure (Hip Roof) is labor intensive hand framing. It is also based on changing the <br /> eve overhang to 18"to create a step in the roof design and lessen the labor to create a roof <br /> that exactly matches the existing structure. <br /> SUB TOTAL each 3600.00 <br /> TOTAL EACH GARAGE UNIT $7105.00 <br /> Savings can be realized with concurrent construction, onsite use of overburden from excavation, and <br /> completing all the proposed activities in the same project. The Framing can be fine tuned when <br /> working blueprints or drawings a ready for and actual "Time and Material takeoff". This is a worst case <br /> estimate of the costs and could be reduced 20%with the right conditions. <br /> in I - ely, <br /> z , j* 0 <br /> UJ!J Deemer <br />
The URL can be used to link to this page
Your browser does not support the video tag.