Laserfiche WebLink
Item No: 7F <br />Meeting Date: October 25, 2010 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Resolution 7694, Approving the Construction of a Concrete Sidewalk <br />along County Road H2 Between County Road 10 and Jackson Drive <br />with Area D of the Street and Utility Improvement Program <br /> <br />Background <br />The Street and Utilities Task Force developed street standards for use in the Street and Utility <br />Improvement Program. The Streets and Utilities Committee reviews and provides <br />recommendations to the City Council for non-standard street and financing issues encountered <br />during implementation of the Program. The Committee reviewed non-standard street design and <br />specific needs issues and considerations for Area D of the Program at their August 16, September <br />20, and October 18 meetings this year. Property owners were invited to attend and provide input <br />and feedback regarding the non-standard streets and specific needs issues with the following: <br /> <br />• Jackson Drive (non-standard due to Municipal State Aid status + parking needs) <br />• Pinewood Court (non-standard due to street width) <br />• County Road H2 Sidewalk (between County Road 10 and Jackson Drive) <br />• Lambert Avenue (standard street – proposed on-street parking for Lambert Park) <br />• Adams & Groberg Streets (standard streets – parking/access needs for adjacent businesses) <br /> <br />Pinewood Court was approved to be reconstructed to a cul-de-sac at the September 27, 2010 <br />Council meeting. The consideration for a sidewalk in the north boulevard along County Road H2 <br />(between County Road 10 and Jackson Drive) was also discussed with the adjacent property <br />owners in Pinewood Court, as well as Vino & Stogies and the NW property owners at Jackson and <br />County Road H2. <br /> <br />Discussion <br />The Sidewalk & Trailway Plan approved with the Comprehensive Plan identifies County Road H2 <br />as a future pedestrian/bicycle corridor (see attached). Since Area D of the Program includes <br />reconstruction of St. Stephen Street, Pinewood Court, and Jackson Drive, there is an opportunity <br />to construct a portion of this proposed sidewalk with the Area D project. In addition, storm sewer <br />is required to be extended from Jackson Drive to Pinewood Court to provide better drainage from <br />the court. The storm sewer construction will require removing/reconstructing the north edge <br />(curbing, boulevard turf, asphalt pavement) of County Road H2 between Pinewood Court and <br />Jackson Drive. <br /> <br />There is very little room along County Road H2 between County Road 10 and Pinewood Court to <br />safely walk. In this section of road, County Road H2 is four lanes wide and pedestrians are forced <br />to walk in the outside lane. These fours lanes merge to two lanes with parallel parking on both <br />sides just west of Jackson Drive. An aerial photo is attached for reference. <br /> <br />Sidewalk is being proposed in the north boulevard adjacent to the curbing along County Road H2. <br />Having the sidewalk in the north boulevard will align better with the bike path in the north <br />boulevard of H2 on the west side of County Road 10. In addition, the south boulevard has fixed <br />obstacles such as trees and parking lot runoff spillways from the Motor Trend property. Sidewalk