Laserfiche WebLink
2008 Mounds View Comprehensive Plan <br />________________________________________________________________________ <br /> <br />Chapter 6: Transportation 6-21 <br />ithin a traffic stream, generally in terms of such service measures as: <br /> <br />• Comfort and convenience <br />For planning purposes, designers use a generalized ADT threshold for roadways. Table 23 below <br />shows the generalized ADT volume thresholds for a roadway type and number of lanes in terms of <br />level of service. Level of service (LOS) is a qualitative measure describing operational conditions <br />w <br />• Speed and travel time <br />• Freedom to maneuver <br />• Traffic interruption <br /> <br />Table 23: Generalized Average Daily Traffic Volume Thresholds <br />Maximum ADT Volume at Level of Service1 <br />Facility Type 2A B C D E <br />2-Lane Roadway - <br /> 3,000 <br /> <br /> 4,500 <br /> <br /> 6,500 <br /> <br /> 8,500 <br /> <br />10,000 Without Turn Lanes <br />With R Turn Lanes <br />With L Turn Lanes3 <br />With L and R Turn Lanes3 <br /> 4,750 <br /> 5,250 <br /> 7,500 <br /> 7,200 <br /> 7,900 <br />11,250 <br />10,300 <br />11,400 <br />16,250 <br />13,500 <br />14,900 <br />21,250 <br />15,900 <br />17,500 <br />25,000 <br />4-Lane Roadway - <br />Without Turn Lanes <br />With R Turn Lanes <br />With L Turn Lanes4 <br />With L and R Turn Lanes4 <br /> <br /> 7,100 <br /> 9,600 <br />10,100 <br />12,600 <br /> <br />10,700 <br />14,400 <br />15,200 <br />18,900 <br /> <br />15,400 <br />20,700 <br />21,900 <br />27,200 <br /> <br />20,100 <br />27,100 <br />28,600 <br />35,600 <br /> <br />23,700 <br />31,900 <br />33,700 <br />41,900 <br />1 ADT Volumes above the LOS E maximum threshold would be considered LOS F. <br />2 LOS D is usually the lowest acceptable LOS allowed by most agencies within the metro area. <br />3 Also considered the planning capacity for a 3-lane roadway (one through lane in each direction with a center, two-way <br />left turn lane) without or with a right turn lane. <br />4 Also considered the planning capacity for a 5-lane roadway (two through lanes in each direction with a center, two- <br />way left turn lane) without or with a right turn lane. <br />• Approximate values based upon several assumptions such as capacity assumptions per lane, directional <br />orientation, peak hour percentages, and ¼ mile signal spacing. <br /> <br /> <br />Figure 17 on page 6-22 shows the roadway network and general lane configurations as they were <br />applied to Table 23 to obtain LOS estimates. Figure 18 on page 6-23 shows the planning LOS values <br />per road segment based on existing traffic volumes. As shown in that figure, the City expects mo <br />the road segments to operate at LOS C or better. There is a segment of County Road J to the east of <br />US Highway 10 that is expected to operate at LOS D. Also, portions of County Road H are operating <br />at lower levels of service. The segment of County Road H between Long Lake Road and Edgewood <br />Drive is operating at LOS D. The segment of County Road H between Edgewood Drive and Old <br />Highway 8 operates at LOS E. The segment of County Road H between Old Highway 8 and County <br />st of <br />ighway 10 operates at LOS F. H