Laserfiche WebLink
<br /> 5 <br />serve less than 3,300 people can leave this section blank, but must provide this information in <br />Section II C. <br />Water Supply System Capacity (GPM/MGD) Note any limitations on use <br />New Brighton Maintain 55 PSI in Dead Ends Prior approval <br />Fridley Maintain 55 PSI in Dead Ends Prior approval <br />Blaine Unknown Prior approval <br />Spring Lake Park Maintain 55 PSI in Dead Ends Prior approval <br />GPM – Gallons per Minute MGD – Million Gallons per Day <br /> <br />D. DEMAND PROJECTIONS. <br /> <br />TABLE 5 Ten Year Demand Projections <br />Year Population <br />Served <br />Average Day <br />Demand <br />(MGD) <br />Maximum <br />Day Demand <br />(MGD) <br />Projected <br />Demand <br />(MGY) <br />2007 12760 1.4 4 MGD 500 MGY <br />2008 12800 1.6 4 MGD 525 MGY <br />2009 12820 1.6 4 MGD 525 MGY <br />2010 12840 1.6 4 MGD 525 MGY <br />2011 12850 1.6 4 MGD 525 MGY <br />2012 12850 1.6 4 MGD 525 MGY <br />2013 12850 1.6 4 MGD 525 MGY <br />2014 12850 1.6 4 MGD 525 MGY <br />2015 12850 1.6 4 MGD 525 MGY <br />2016 12850 1.6 4 MGD 525 MGY <br />MGD – Million Gallons per Day MGY – Million Gallons per Year <br /> <br />Projection Method. Describe how projections were made, (assumptions for per capita, per <br />household, per acre or other methods used). <br />Projections were based on 1. Average of previous five years. 2. Medtronics connecting to the <br />system. 3. Mounds View being fully developed <br /> <br /> <br />E. RESOURCE SUSTAINABILITY <br /> <br />Sustainable water use: use of water to provide for the needs of society, now and in <br />the future, without unacceptable social, economic, or environmental consequences. <br /> <br />Monitoring. Records of water levels should be maintained for all production wells and source <br />water reservoirs/basins. Water level readings should be taken monthly for a production well or <br />observation well that is representative of the wells completed in each water source formation. If <br />water levels are not currently measured each year, a monitoring plan that includes a <br />schedule for water level readings must be submitted as Attachment. <br /> <br />TABLE 6 Monitoring Wells - List all wells being measured. <br />Unique well <br />number <br />Type of well <br />(production, <br />observation) <br />Frequency of <br />Measurement <br />(daily, monthly etc.) <br />Method of <br />Measurement (steel <br />tape, SCADA etc.) <br />206721 Production Monthly SCADA