My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2009/02/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2009
>
Agenda Packets - 2009/02/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:22 PM
Creation date
7/4/2018 10:23:05 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/8/2009
Supplemental fields
City Council Document Type
City Council Packets
Date
2/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View Page 47 <br />Local Surface Water Management Plan 435-08-135 <br />process. It should be noted that the activities identified in Table 8.3 are not numbered in order of <br />importance or priority; rather they are numbered for reference purposes only. <br />Table 8.3 - System Improvement Activities Listed by Activity Category <br />Activity <br /># <br />Activity <br />Category Project Description Prop. <br />Start <br />Est. <br />Cost <br />1 Capital <br />Improvement <br />Mustang Drive <br />Improvements <br />Provide overflow conveyance capacity and <br />additional flood storage (see Mustang Drive <br />Drainage Study) <br />2010 $28,000 <br />2 Capital <br />Improvement <br />Greenfield Park <br />Culvert Replacement Replace existing entrance culvert 2010 $12,000 <br />3 Capital <br />Improvement <br />Greenfield Park <br />Culvert Crossing <br />Improvements <br />Perform improvements in accordance with park <br />planning 2011 $20,000 <br />4 Capital <br />Improvement <br />Greenfield Park <br />Judicial Ditch 1 Outlet <br />Modifications <br />Modify existing outlet configuration to improve <br />hydraulics and reduce flooding, and evaluate the <br />need for additional flood storage. <br />2011 $28,000 <br />5 Capital <br />Improvement <br />Silver View Pond <br />Sediment Basin <br />Hydraulic function verification, regrading and <br />revegitation plans 2011 $21,000 <br />6 MS4 Permit <br />Compliance <br />Annual NPDES <br />Reporting Writing and administering MS4 annual reports Ongoing NA <br />7 MS4 Permit <br />Compliance Surface water Map SWPPP Implementation Item: complete a map <br />showing City surface water system features 2009 $2,500 <br />8 MS4 Permit <br />Compliance <br />General Inspection <br />and Maintenance <br />Program <br />General inspection and maintenance of the City’s <br />stormwater management system, including: <br />Bi-annual street sweeping <br />Ditches and storm sewer <br />Outfalls and stormwater ponds <br />Structural pollution control devices <br />Ongoing NA <br />9 MS4 Permit <br />Compliance Complete Staff <br />Training <br />Complete City staff training in the operation, <br />maintenance and inspection of the City’s storm <br />sewer system <br />Ongoing NA <br />10 MS4 Permit <br />Compliance <br />Illicit Discharge and <br />Illicit Connection <br />Ordinance <br />Create a new ordinance 2009 $5,000 <br />11 MS4 Permit <br />Compliance <br />Post Construction Site <br />Runoff Control <br />Review and update Chapter 1302 as necessary to <br />comply with MPCA requirements.2009 $2,500 <br />12 MS4 Permit <br />Compliance <br />Impaired Waters <br />Report <br />Conduct impaired waters evaluations and prepare <br />an impaired waters report, per BMP 7-3 (4 total)2010 $10,000 <br />13 Agency <br />Compliance <br />Wetlands and Public <br />Waters Ordinance <br />Review and update Chapter 1010 as necessary to <br />comply with RCWD and Met Council requirements.2009 $2,500 <br />14 System <br />Maintenance <br />Stormwater Pond <br />Maintenance Program <br />Develop a program to track, remove, and dispose <br />of sediment from existing stormwater ponds 2010 NA <br />8.5 POSSIBLE FUTURE IMPLEMENTATION ACTIVITIES <br />These activities generally include coordination efforts other agencies or potential future activities <br />that have yet to be finalized. These future implementation activities identified below are relevant
The URL can be used to link to this page
Your browser does not support the video tag.