Date April 3, 2009 <br />Bond No: <br />Description of Work <br />Contract Unit Total <br />No.Item Unit Quantity Price Amount <br />CHANGE ORDER NO. 1, PART A (DEDUCT) <br />1 5' CIPP, 8" VCP EA 8 ($1,673.75) ($13,390.00) <br />2 10' CIPP, 8" VCP EA 1 ($2,575.00) ($2,575.00) <br />3 INLINE CIPP, 8" VCP LF 377 ($34.00) ($12,818.00) <br />4 TEST 8" SEWER JOINT EA 6 ($211.15) ($1,266.90) <br />5 SEAL 8" SEWER JOINT EA 6 ($72.10) ($432.60) <br />6 CHEMICAL GROUT GL 20 ($9.90) ($198.00) <br />TOTAL CHANGE ORDER NO. 1, PART A (DEDUCT)($30,680.50) <br />CHANGE ORDER NO. 1, PART B (ADD) <br />7 INLINE CIPP, 8" VCP LF 4819 $29.93 $144,232.67 <br />TOTAL CHANGE ORDER NO. 1, PART B (ADD)$144,232.67 <br />TOTAL CHANGE ORDER NO. 1, PART A (DEDUCT)($30,680.50) <br />TOTAL CHANGE ORDER NO. 1, PART B (ADD)$144,232.67 <br />TOTAL CHANGE ORDER NO. 1:$113,552.17 <br />Part A: <br />Part A of this Change Order deletes from the contract those bid items and quantities for the sanitary sewer spot repairs that are no <br />longer necessary. It also deletes the original contract quantity and unit price for the slip lining bid item. <br />Part B: <br />Part B of this Change Order adds the total quantity of slip lining to be performed to the contract, and also identifies the revised unit <br />price for the slip lining item. <br />Owner: City of Mounds View, 2401 Hwy. 10, Mounds View, MN 55112 <br />Contractor: North Valley, Inc., 20015 Iguana St. NW, Nowthen, MN 55330 <br />Bond Company: <br />This Change Order modifies the non-intrusive sanitary sewer repairs to be performed as part of the project. The original contract <br />included several spot repairs of the sanitary sewer system, including chemical sealing of individual pipe joints, and installation of <br />short length (5 to 10 feet) cured in place liners. In addition to the spot repairs the original contract also included cured in place slip <br />lining of one complete segment of sanitary sewer main from manhole to manhole. <br />This Change Order will provide for performing cured in place slip lining for several additional segments of the sanitary sewer from <br />manhole to manhole. For those segments of sanitary sewer where a spot repair was originally included in the contract but that will <br />now be slip lined for their entire length, the work for individual spot repairs is no longer necessary. Due to the increased amount <br />of slip lining to be performed, a new unit price for the work was negotiated. <br />The segments of sanitary sewer to be slip lined are shown on the revised sheets of the construction documents. <br />CHANGE ORDER NO. 1 <br />2009-2010 STREET AND UTILITY IMPROVEMENT PROJECT <br />CLIENT PROJECT NO.2008-003 <br />BONESTROO FILE NO. 000435-07129-0 <br />435-07129CHO1.xls