My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2018/10/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
Agenda Packets - 2018/10/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:44 PM
Creation date
7/4/2018 11:33:05 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/25/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
10/25/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 11B4 <br />Meeting Date: October 26, 2009 <br />Type of Business: Reports <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br /> <br /> <br /> <br />To: Honorable Mayor and City Council <br />From: Nick DeBar, Public Works Director <br />Item Title/Subject: Public Works Project Updates <br /> <br />2009/2010 Street and Utility Improvement Project – Area A: <br />Although the weather the last couple of weeks has deterred any meaningful construction, the <br />summer of 2009 will be remembered as a tremendously good year for weather, and good <br />weather is a catalyst for road construction. Work in all phased areas is mostly complete with <br />exception to Red Oak Drive. This is the last remaining road in the project that needs a final <br />wearing course of asphalt. Restoration is substantially complete on all streets (except Red Oak <br />Drive north of Sherwood) including resuming of mail service. Overall, the work is approximately <br />90% complete. Keep in mind that Area A was planned to have major construction over two <br />summers. There will be some miscellaneous restoration and repair on Area A next year, and <br />the City has a 2-year warranty/guarantee on all work. We’ve learned a lot from Area A that will <br />be useful in design and construction of future areas. <br />2010 Street and Utility Improvement Project – Area B/C: <br />Final design and preparation of plans/specifications for streets in Area B and C are currently in <br />high gear. Bonestroo expects to have bidding documents (plans/specs) ready in the next <br />couple of months and we are still on track for a February bid opening. Plans will be sent to Rice <br />Creek Watershed District in December for review and approval at their January meeting. City <br />staff is coordinating Edgewood Drive design elements with Edgewood Middle School (EWMS), <br />including the possibility of including their bus turnaround/visitor parking improvements as part of <br />our project. This would be similar to the agreement with Silver Lake Woods in Area A and <br />EWMS would be responsible for all costs associated with their improvements. EWMS has also <br />asked the City to assist them with several rain gardens. City staff will be meeting with EWMS <br />staff in the next couple of weeks to coordinate. <br />Street and Utility Improvement Project – Area D: <br />The City Council authorized Bonestroo to perform the preliminary survey in Area D. Bonestroo <br />is anticipating beginning the survey work the week of October 19, 2009. Notices were sent to <br />property owners in Area D to notify them of the activities that will be taking place in their <br />neighborhoods with the survey. Construction for Area D is anticipated to occur in 2011. <br />County Road 10 Trail Segments 1-5: <br />Work for the bike trail along the north boulevard of County Road 10 has also been hampered by <br />lousy weather the last couple of weeks. Currently, most utility work and pavement excavation <br />and base construction is complete. Work for lighting is advancing and should be operational <br />before winter kicks in. Paving operations will depend upon weather; however, the contractors <br />(and City) are hopeful that the trail will be paved by early November. <br />Backstop Fencing Improvements for Ball Fields at Groveland, Hillview, Silver View, and <br />CH Parks: <br />Fencing improvements as approved and authorized for construction by the City Council will <br />begin construction in the next week or two. Public Works is finalizing the construction <br />agreement with the successful bidder, Century Fence Company of Forest Lake. Work is <br />anticipated to be completed before winter, or at worst, early next spring before the baseball <br />season begins. <br />
The URL can be used to link to this page
Your browser does not support the video tag.