My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2008/06/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2008
>
Agenda Packets - 2008/06/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:25 PM
Creation date
7/5/2018 7:56:32 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/9/2008
Supplemental fields
City Council Document Type
City Council Packets
Date
6/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NO.DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE <br />1 MOBILIZATION LUMP SUM 1 $12,000.00 $6,000.00 <br />2 CLEARING ACRE 0.1 $4,500.00 $548.86 <br />3 GRUBBING ACRE 0.1 $4,200.00 $512.27 <br />4 REMOVE CURB AND GUTTER LIN FT 40 $7.10 $284.00 <br />5 REMOVE CONCRETE WALK SQ FT 20 $4.50 $90.00 <br />6 REMOVE BITUMINOUS PAVEMENT SQ YD 290 $5.00 $1,450.00 <br />7 REMOVE METAL APRON EACH 2 $100.00 $200.00 <br />8 COMMON EXCAVATION (P)CU YD 647 $15.00 $9,705.00 <br />9 GRANULAR BORROW TN 13 $13.00 $169.00 <br />10 GEOTEXTILE FABRIC TYPE V SQ YD 71 $2.50 $176.80 <br />11 AGGREGATE BASE CLASS 5 MOD TON 130 $18.50 $2,405.00 <br />12 TYPE LV 4 WEARING COURSE MIXTURE (B)TON 40 $76.00 $3,040.00 <br />13 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LIN FT 48 $3.75 $180.00 <br />14 BITUMINOUS MATERIAL FOR TACK COAT GALLON 15 $1.50 $22.50 <br />15 15" RC PIPE CULVERT CLASS V LIN FT 50 $32.00 $1,600.00 <br />16 15" RC PIPE APRON EACH 2 $240.00 $480.00 <br />17 6" CONCRETE WALK SQ FT 160 $6.75 $1,080.00 <br />18 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 40 $27.00 $1,080.00 <br />19 TRUNCATED DOME PANEL SQ FT 16 $31.00 $496.00 <br />20 TRAFFIC CONTROL LUMP SUM 1 $4,000.00 $4,000.00 <br />21 PERENNIAL 1 GAL CONT PLANT 83 $13.50 $1,120.50 <br />22 DECIDUOUS SHRUB NO 2 CONT SHRUB 16 $40.00 $640.00 <br />23 LANDSCAPE EDGING, METAL LIN FT 220 $5.50 $1,210.00 <br />21 SEEDING, INCL SEED, MULCH AND DISK ANCHOR AC 0.2 $2,300.00 $559.13 <br />22 SEEDING, TYPE 2 AC 0.2 $9,000.00 $2,004.13 <br />23 NATIVE SEEDING MAINTENANCE LUMP SUM 1 $2,000.00 $2,000.00 <br />24 SILT FENCE, TYPE MACHINE SLICED LIN FT 200 $2.25 $450.00 <br />25 CLEAN PIPE CULVERT EACH 2 $250.00 $500.00 <br />26 CULVERT PROTECTION EACH 2 $350.00 $700.00 <br />27 RANDOM RIPRAP CLASS II CU YD 2 $100.00 $200.00 <br />28 SODDING TYPE LAWN SQ YD 118 $4.40 $518.61 <br />29 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 400 $2.00 $800.00 <br />$44,221.81 <br />$2,211.09 <br />$46,432.90 <br />$12,536.88 <br />$58,969.79 <br />Trail Segment 1 $287,330 <br />Trail Segment 2 $236,733 <br />Trail Segment 3 $227,811 <br />Trail Segment 4 $228,564 <br />Trail Segment 5 $235,104 <br />Trail Segment A Connection $58,970 <br />Total Project Cost $1,274,512 <br />Total Project Cost <br />Engr, Fiscal, & Admin (27%) <br />Total Segment A Cost <br />TRAIL SEGMENT A - COUNTY ROAD H2 TO EDGEWOOD DRIVE <br />Sub-Total Segment A <br />Construction Contingency (5%) <br />Total Construction Cost - Segment A <br />A-6
The URL can be used to link to this page
Your browser does not support the video tag.