Laserfiche WebLink
<br /> <br />7 <br /> <br />barricaded and closed. In the event residences are occupied before completing streets, <br />driveways or parking areas, the Developer shall maintain a smooth driving surface and <br />adequate drainage on all temporary drive areas. The Developer shall be responsible for <br />any damage to the street incurred during construction. The Developer or contractor shall <br />repair the street to City standards. <br /> <br />8. The Developer shall inspect and if necessary clean all catch basins, sumps, and ponding <br />areas of erosion/siltation and restore them to the original condition at the end of <br />construction within this development. All silt fence and other erosion control should be <br />removed following the establishment of turf. <br /> <br />9. If applicable, the Developer shall work with Xcel Energy and furnish street lights <br />according to the Mounds View City Code Chapter 904, Street Lighting. Street lights in <br />public rights-of-way shall conform to City Code in all respects. <br /> <br />10. The Developer shall dedicate and survey the storm water infiltration area as required by <br />the City. The Developer shall be responsible for storm sewer cleaning and holding pond <br />dredging, as required, by the City before completion of the development. <br /> <br />11. The Developer shall be responsible for securing all necessary approvals and permits <br />from all appropriate Federal, State, Regional, County and local jurisdictions before <br />starting site grading or construction and before the City awarding construction contracts <br />for public utilities. Specifically, before obtaining any building permits or grading <br />permits as required under this Article or otherwise, the Developer shall complete the <br />following requirements: <br /> <br />a. Rice Creek Watershed District (RCWD) final approval and permit is <br />required. <br /> <br />b. The Developer shall provide the City with a $50,000 form of financial <br />guarantee, as described in section 2.05 to guarantee the construction of the <br />Improvements. <br /> <br />c. The Developer shall record with Ramsey County this Agreement and <br />Resolution ________. The Developer shall provide proof to the City of such <br />recordation within 10 days of the recording. <br /> <br />d. The Developer shall submit the required park dedication payment of $32,150 <br />and a County Highway 10 Trailway contribution payment of $8,040 to the <br />City before the Mayor and City Clerk-Administrator affix their respective <br />signatures to the approved Final Plat. The Developer further expressly <br />acknowledges and agrees that the Improvements and all easements and other <br />rights in the Property necessary and related to the City’s ownership of the <br />Improvements (all of which shall be described in the plat required by the <br />City’s subdivision regulations), shall inure to the City upon the Developer’s <br />compliance with this Agreement, acceptance by the City of the <br />Improvements, and approval and recording of a final plat as set forth in the <br />City’s subdivision regulations.