Laserfiche WebLink
County for our share of the project. <br /> Don B. <br /> PUBLIC WORKS <br /> On March 16, 1994, we had a water main break on Greenwood Drive and Woodcrest <br /> Drive. We had some problems with the telephone company on getting a locate, but <br /> by 11:30am, the break was repaired. Good job Bill, Bill, Larry and Wally! <br /> Gary and Cheryl have been working on the sign trailer. This will house all of the <br /> necessary street signs, ie. road closed, fresh oil, right lane closed, etc. to easily be <br /> placed when street work is the process. <br /> Road restrictions went into effect March 14, and we have been issuing permits to the <br /> haulers. The response has been good but-we still have a few haulers that "drag their <br /> feet" and grumble. Denny from Ace Sanitation, thinks our permit procedure works <br /> great. He has been telling other City's that they "should contact Mounds View and <br /> adopt their policy/procedure". As of 3-23-94, we have collected $2,540.00 in permit <br /> fees. <br /> The ditch cleaning process for Greenfield Ponds and Ardan will begin during the <br /> week of March 28. The cleaning will not widen or alter the design of the ditches in <br /> any way. Approximately 120 yards of material will be removed from the Greenfield <br /> ditch and 125 yards from the Ardan ditch. <br /> Tim is experiencing some back problems, and was out of work Monday and Tuesday. <br /> Hopefully he'll get back to his healthy self soon. <br /> Gary started sweeping streets on Tuesday. <br /> Larry and Wally are televising sewer. <br /> Bill and Bill have been devoting most of their time on Treatment Plants 2 and 3 and <br /> getting them in working condition. <br /> Tracy <br />