Laserfiche WebLink
Land Allocation and Coverage Calculations <br /> Multi-Tech Existing Site: <br /> Approximate Site Area 247 ,518 <br /> Building Footprint Area 52 , 156 <br /> Building to Land Coverage 21% <br /> Parkin- gand_ Drive-Area 114 , 016 <br /> (46%) <br /> Surfaced Area of Site 166 , 172 <br /> ( 67%) <br /> Open Space and Green Area 81,346 <br /> ( 33%) <br /> Multi-Tech Site with Addition: <br /> Site Area ( same) 247 ,518 <br /> Building Footprint Area <br /> Addition Footprint 17 ,480 <br /> Total Building Footprint 69, 436 <br /> Building to Land Coverage 28% <br /> Parking and Drive Areas Added 17 , 650 <br /> Total Parking and Drive Area 114 , 186 <br /> (46%) <br /> Surfaced Area of Site 183 , 622. <br /> ( 74%) <br /> Open Space and Green Area 63, 846 <br /> ( 26%) <br /> Phasing Schedule <br /> - The Multi-Tech Systems expansion project is proposed for <br /> construction commencing spring, 1994 , as soon as necessary <br /> project approvals can be obtained, with completion by fall, <br /> 1994 . <br />