My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1994/05/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1994
>
Agenda Packets - 1994/05/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:43 PM
Creation date
7/6/2018 10:14:07 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/2/1994
Supplemental fields
City Council Document Type
City Council Packets
Date
5/2/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1995 PROGRAM/PERFORMANCE BUDGET <br /> DIVISION STREETS PROGRAM SNOW AND ICE CONTROL <br /> FUNDING SOURCE GENERAL <br /> PROGRAM PURPOSE <br /> Provide efficient and effective snow removal and ice control on municipal streets. <br /> PROGRAM SUMMARY <br /> The division will utilize two dump trucks and one loader equipped with plows and wings to remove snow and <br /> apply the icing chemicals to the City streets. A skidloader mounted blower and tractor mounted broom are <br /> used to maintain sidewalks and pathways. The icing chemicals are applied at intersections, hills, and curves. <br /> Computerized sander controls are requested for 1995 to increase sanding proficiency and accuracy. This <br /> program is General Fund supported. <br /> 1995 PROGRAM QBJECTIVES <br /> The commencement of operations will begin at the accumulation of two inches of snow. Factors, including <br /> time of day, snow forecast, staff availability, and road conditions, may be considered as to whether full or <br /> partial operations will proceed. A goal of this program is to plow all streets, curb to curb, after a normal (2 <br /> to 6 inches) snow fall within 10 hours, a major winter storm within 24 hours. <br /> 1995 PROGRAM PERFORMANCE MEASURES <br /> 1. Provide bare pavement at intersections, hills, and curves. <br /> 2. Plow all roads full width and bench snow banks when additional snow storage is necessary. <br /> 3. Remove snow from all sidewalks and pathways within 8 hours following a snow storm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.